MHE BATTERIES AT DLA DISTRIBUTION WARNER ROBINS, GA (DDWG)

SOL #: SP330026Q0110Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA DISTRIBUTION
NEW CUMBERLAND, PA, 17070-5008, United States

Place of Performance

Warner Robins, GA

NAICS

Battery Manufacturing (335910)

PSC

Batteries, Rechargeable (6140)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 3, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
Apr 24, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Distribution Acquisition Operations J7 is soliciting quotes for Material Handling Equipment (MHE) Batteries at DLA Distribution Warner Robins, GA (DDWG). This is a 100% Total Small Business Set-Aside opportunity. The solicitation, SP3300-26-Q-0110, seeks new, commercially available MHE batteries and Flow-Rite watering systems. Quotes are due by April 24, 2026, at 1:00 PM EST.

Scope of Work

The contractor will procure and deliver new, commercially available MHE batteries and Flow-Rite watering systems. Key requirements include:

  • Batteries must be compatible with existing Government-owned MHE and meet specified voltage, capacity, dimensional, termination, and connector requirements.
  • All batteries must be new, unused, defect-free, and fully compatible with existing chargers and equipment.
  • Flow-Rite watering kits are to be installed prior to delivery where specified in the Schedule of Supplies.
  • Delivery is FOB Destination to DLA Distribution Warner Robins, GA.
  • No on-equipment installation or removal of existing batteries is required.
  • All items must be delivered undamaged and ready for operational use.
  • A minimum 24-month manufacturer warranty is required for maintenance-free batteries.

Contract Details

  • Contract Type: Firm-Fixed Priced (FFP) purchase order.
  • Delivery: 45 days after receipt of order.
  • Product Service Code (PSC): 6140 – Batteries, Rechargeable.
  • Shipping Address: DLA Distribution Warner Robins, GA (DDWG), 450 Martin Luther King Jr. Blvd, Bldg 385, Robins AFB, GA 31098.

Submission & Evaluation

  • Quotes must be submitted electronically via email to brian.keckler@dla.mil by April 24, 2026, 1:00 PM EST.
  • Facsimile and hard copy submissions will not be accepted.
  • Quotes must include all required documentation; failure to do so may result in elimination.
  • Award will be made on an all-or-none basis to the responsive, responsible Offeror whose quote is the most advantageous to the Government, considering Lowest Technically Acceptable Price (LTAP) with the lowest overall price for ALL CLINs.
  • Technical Capability and Past Performance are evaluated on an Acceptable/Unacceptable basis, with price being the determining factor for technically acceptable quotes.

Eligibility & Set-Aside

  • This solicitation is a 100% small business set-aside.
  • NAICS Code: 335910 (Battery Manufacturing) with a size standard of 1,250 employees.

Key Dates & Contact

  • Published Date: April 7, 2026 (Amendment 0001)
  • Quote Due Date: April 24, 2026, 1:00 PM EST
  • Primary Contact: Brian Keckler, brian.keckler@dla.mil, 614-693-7800

People

Points of Contact

Brian KecklerPRIMARY

Files

Files

Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View