MHE BATTERIES AT DLA DISTRIBUTION WARNER ROBINS, GA (DDWG)

SOL #: SP330026Q0110Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA DISTRIBUTION
NEW CUMBERLAND, PA, 17070-5008, United States

Place of Performance

Warner Robins, GA

NAICS

Battery Manufacturing (335910)

PSC

Batteries, Rechargeable (6140)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 3, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 1, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Distribution is soliciting quotes for Material Handling Equipment (MHE) Batteries and associated watering systems for DLA Distribution Warner Robins, GA (DDWG). This is a Total Small Business Set-Aside opportunity, issued as a Request for Quote (RFQ) under solicitation SP3300-26-Q-0110. The deadline for submissions is May 1, 2026, at 1:00 PM EST.

Scope of Work

The requirement is for the procurement and delivery of new, commercially available MHE batteries and Flow-Rite watering systems. These must be compatible with existing Government-owned MHE at DDWG. Key specifications include:

  • Batteries must meet specific voltage, capacity, dimensional, termination, and connector requirements.
  • They must be new, unused, defect-free, and fully compatible with existing chargers and equipment.
  • Flow-Rite watering kits are to be installed prior to delivery where specified.
  • Delivery is FOB Destination within 45 days after receipt of order.
  • No on-equipment installation or removal of existing batteries is required.
  • A minimum 24-month manufacturer warranty is required for maintenance-free batteries.
  • Specific battery models include Hawker Powerline LM for various Crown and Hyster lifts, and JLG 12v Trojan AES (901895) batteries for JLG equipment. Clarifications specify Trojan 31-AES batteries and note that steel covers are not strictly required if other dimensional and fitment specifications are met.

Contract Details

  • Contract Type: Firm-Fixed Priced (FFP) purchase order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 335910 (Battery Manufacturing) with a size standard of 1,250 employees.
  • Product Service Code (PSC): 6140 – Batteries, Rechargeable.
  • Place of Performance: DLA Distribution Warner Robins, GA.

Submission & Evaluation

  • Quotes must be submitted electronically via email to brian.keckler@dla.mil.
  • Submission Deadline: May 1, 2026, at 1:00 PM EST.
  • Award will be made on an all-or-none basis to the responsive, responsible Offeror whose quote is the most advantageous to the Government, considering Lowest Technically Acceptable Price (LTAP) with the lowest overall price for ALL CLINs.
  • Technical Capability and Past Performance will be evaluated on an Acceptable/Unacceptable basis.

Key Amendments

  • Amendment 0004 extended the submission deadline to May 1, 2026.
  • Amendment 0005 included updated Questions and Answers, clarifying specific battery models (Trojan 31-AES) and confirming that steel covers are not mandatory if other specifications are met.
  • Amendment 0006 added FAR clause 52.222-90, "ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS."
  • Offerors must acknowledge all amendments.

People

Points of Contact

Brian KecklerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View