MIN QTY Two (2) hard bearing, dual drive, horizontal balance machines with potential option for QTY 2

SOL #: 26-13-1100Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION
RICHMOND, VA, 23237, United States

Place of Performance

Tinker AFB, OK

NAICS

Commercial and Service Industry Machinery Manufacturing (333310)

PSC

Miscellaneous Machine Tools (3419)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 8, 2025
2
Last Updated
Apr 13, 2026
3
Response Deadline
Jan 7, 2026, 4:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) - Weapons Support (Richmond) is conducting a Sources Sought for market research to identify capable vendors for two (2) hard bearing, dual drive, horizontal balance machines, with a potential option for two additional units in a follow-on fiscal year. These machines are required for the 76th Propulsion Maintenance Group (PMXG) at Tinker Air Force Base, Oklahoma City, Oklahoma. Turnkey services, including installation, training, and technical data, are also required. Responses are due by April 21, 2026.

Scope of Work

This requirement is for a minimum of two (2) new, commercially available hard bearing, dual-drive, horizontal balancing machines.

  • Machine 1: Must meet or exceed ARP 4048, Class 1000 specifications.
  • Machine 2: Must meet or exceed ARP 4048, Class 3000 specifications. Both machines must be fully capable of calibration and certification to SAE AS8617 standards. Turnkey services include:
  • Rigging and installation at Tinker AFB, Oklahoma City.
  • Foundation work (concrete pad required for each balancer).
  • Training for personnel.
  • Technical data (manuals, drawings, specifications, maintenance instructions, spare parts lists).
  • Shipping. The contractor is responsible for complete installation, qualification, and certification testing, including providing a Plan of Action and Milestones (POA&M) and an Acceptance Test Plan (ATP). The government will provide 480VAC electrical supply and 100 PSI compressed air within 30 feet. Site-specific details from Attachment A indicate work in Building 3001, F117 Shop and F100 Rotor Shop, with considerations for foundation thickness, existing utilities, and site preparation.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Set-Aside: None specified (market research stage)
  • Response Due: April 21, 2026, by 03:59 AM UTC.
  • Published: April 13, 2026.
  • Place of Performance: Tinker Air Force Base, Oklahoma City, Oklahoma, USA.

Submission Requirements

Interested parties should submit a response not exceeding ten (10) one-sided 8.5 x 10 inch pages (10pt font minimum) via email to avnipemarketresearch@dla.mil with the subject line: "ATTN 26-13-1100". Responses should include:

  • Description of company capabilities.
  • Comments on the attached Statement of Work, identifying ability to meet requirements or proposing alternatives.
  • Company business size (employees, domestic/foreign) for set-aside consideration.
  • Manufacturer status (Manufacturer/Non-Manufacturing Source) and manufacturer identification if applicable.
  • Indication of intent to partner with subcontractors.
  • Basis of estimate for total financial budget, broken down by Machine Cost, Training, Tech Data, Installation, Rigging, Shipping, and Foundation.

Additional Notes

This is for information purposes only and does not constitute a solicitation or commitment by the Government. No funds are available for response preparation. Telephone inquiries will not be accepted.

People

Points of Contact

Christopher BaraPRIMARY

Files

Files

Download

Versions

Version 2
Sources Sought
Posted: Apr 13, 2026
View
Version 1Viewing
Sources Sought
Posted: Dec 8, 2025
MIN QTY Two (2) hard bearing, dual drive, horizontal balance machines with potential option for QTY 2 | GovScope