MOORING SYSTEM

SOL #: N0040626Q0033Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR PUGET SOUND
BREMERTON, WA, 98314-5100, United States

Place of Performance

Everett, WA

NAICS

All Other Rubber Product Manufacturing (326299)

PSC

Marine Hardware And Hull Items (2040)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 23, 2026
2
Last Updated
Apr 30, 2026
3
Submission Deadline
Apr 24, 2026, 3:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy (NAVSUP FLT LOG CTR PUGET SOUND) is seeking quotes for a Mooring System at Naval Station Everett, WA. This is a Combined Synopsis/Solicitation (RFQ) for BRAND NAME OR EQUAL Seaflex Inc mooring parts, including hawsers, splice kits, polyester rope, and anchor eyelets. The acquisition is a Total Small Business Set-Aside. Quotes are due by April 23, 2026, at 11:59 PM EST.

Scope of Work

This requirement is for the procurement of specific mooring system components for concrete floats at Naval Station Everett, WA (2000 West Marine View Dr., BLDG 2125). The system must withstand challenging environmental conditions, including significant water level variations (over 19.5 feet during spring tides), wave heights up to 6 feet, and wind gusts exceeding 70 mph. The docks, manufactured by Bellingham Marine, can accommodate up to 8 vessels.

Key items include:

  • Seaflex hawsers (8-055 BP TH, 8-060 BP TH, 8-065 BP TH, 12-065 BP TH) with by-pass and titanium end crimps.
  • Splice start kits for rope splicing.
  • Polyester rope (32mm/180kN and 36mm/226kN) in various coil lengths.
  • 20mm SS anchor eyelets.

Material requirements emphasize corrosion resistance due to saltwater exposure, with titanium end crimps preferred and Stainless Steel AISI 316 or hot-dipped galvanized acceptable for other components. Helical anchors are not being considered due to restricted access.

Contract Details

  • Solicitation Number: N0040626Q0033
  • Contract Type: Firm Fixed Price (intended award without discussions).
  • Set-Aside: Total Small Business.
  • NAICS Code: 326299 (Small Business Size Standard: 650 employees).
  • Place of Performance: Naval Station Everett, WA.
  • Anticipated Award Date: April 2026.
  • Anticipated Delivery: 90 days after contract award (FOB Destination).

Submission & Evaluation

Award will be made to the responsible offeror whose quote represents the best value to the Government, considering price, delivery, technical acceptability, past performance, and other factors. Quotes must be valid for at least 60 days.

Required Quote Information:

  1. Official Company Name
  2. Point of contact (name, phone, email)
  3. Cage Code number
  4. Business size
  5. Payment terms
  6. Unit price, extended price, total amount, and lead time(s)
  7. Specification sheet for any "brand name or equal" parts quoted as equivalents.

Quotes must be submitted in Microsoft Word, Excel, or Adobe PDF. Offerors must clearly indicate any exceptions to the solicitation's terms, conditions, specifications, or statement of work.

Key Dates

  • Questions Due: 3 days before the solicitation closing date.
  • Quotes Due: April 23, 2026, at 11:59 PM EST.

Amendments & Clarifications

Amendment 0001 extended the response due date. Amendment 0002 updated question #6. Q&A documents clarify installation location, dock specifications (Bellingham Marine concrete floats), environmental conditions, vessel capacity (max 8), and material preferences (titanium end crimps, corrosion-resistant materials). The solicitation timeline was extended due to the urgency of pier conditions and engineer review.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View
Version 1
Sources Sought
Posted: Mar 23, 2026
View