NIPR Network Drops and Multi-Mode (MM) Cable Installation Bldg 15177

SOL #: FA282326Q0030Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2823 AFTC PZIO
EGLIN AFB, FL, 32542-5418, United States

Place of Performance

GOULDS, FL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 1, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 7, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (AFTC PZIO) has issued a Combined Synopsis/Solicitation for the installation of CAT6A NIPR Network Drops and 24-Strand Multi-Mode (MM) Cable in Building 15177 on Eglin Air Force Base, Florida. This opportunity is a Total Small Business Set-Aside. Proposals are due by May 7, 2026, at 3:00 PM EST.

Scope of Work

The contractor will Engineer, Furnish, Install, and Test (EFI&T) 48 CAT6A network drops and two 24-strand Multi-Mode (MM) fiber optic cables within Building 15177. The work includes:

  • CAT6A Drop Installation: Installing 48-port modular patch panels, 40 CAT6A data cables and jacks from Comm Room 006 to Room 002, and 8 CAT6A data cables and jacks from Comm Room 006 to Room 005. This involves specific wall penetrations, sleeves, J-hooks, and fire stopping.
  • Fiber Optic Installation: Installing two 24-strand Aqua MM fiber optic cables from Comm Room 006 to Comm Room 202 and Comm Room 120, including LC cassettes, termination on new wall-mounted Fiber Optic Distribution Panels (FODPs), and utilizing existing pathways. All installations must adhere to the 96th Communications Squadron Cyber Infrastructure Standards and Installation Specifications (CISIS).

Performance Standards & Special Requirements

All testing must comply with OFSTP-14, OFSTP-7, TIA-568-C.3, and TIA-526-7, with test equipment calibrated within one year. The contractor is responsible for providing all tools, installation materials, and test equipment, and must repair any damage caused during performance. A complete list of proposed products must be submitted with the proposal.

Deliverables

Required deliverables include ISP/OSP copper/fiber test reports and As-Built drawings in .PDF format. Acceptance testing involves a government witness test of a 10% sample of installed drops/strands, expanding to 100% if failures occur, followed by a final QC inspection. Discrepancies must be corrected within five duty days.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: May 1, 2026, to September 30, 2026
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: N059 (Installation Of Equipment: Electrical And Electronic Equipment Components)
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)

Submission & Contact

Proposals are due by May 7, 2026, at 3:00 PM EST. The solicitation references FAR 52.212-1, 52.212-3, and 52.212-4 for instructions and terms. Evaluation factors are mentioned on page 16 of the solicitation, though specific details are not provided in the summary. Primary Contact: Brooke Socolofsky, brooke.socolofsky@us.af.mil.

People

Points of Contact

Brooke SocolofskyPRIMARY

Files

Files

Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 1, 2026
View