NIPR Network Drops and Multi-Mode (MM) Cable Installation Bldg 15177

SOL #: FA282326Q0030Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2823 AFTC PZIO
EGLIN AFB, FL, 32542-5418, United States

Place of Performance

GOULDS, FL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 1, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 7, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the installation of CAT6A NIPR Network Drops and 24-Strand Multi-Mode (MM) Cable in Building 15177 at Eglin Air Force Base, Florida. This is a 100% Small Business Set-Aside opportunity. The contract will be a Firm-Fixed-Price Definitive Contract. Offers are due by May 7, 2026, at 10:00 A.M. CST.

Scope of Work

The contractor will Engineer, Furnish, Install, and Test (EFI&T) 48 CAT6A network drops and two 24-strand Multi-Mode (MM) fiber optic cables within Building 15177. Key tasks include:

  • Installing a 48-port modular patch panel in Comm Room 006, Rack C.
  • Installing 40 CAT6A data cables and jacks from Comm Room 006 to Room 002, and 8 CAT6A data cables and jacks from Comm Room 006 to Room 005.
  • Installing specific wall penetrations, sleeves, and approximately 65 feet of J-hooks.
  • Installing two 24-strand Aqua MM fiber optic cables from Comm Room 006 to Comm Room 202 and Comm Room 120, including LC cassettes and termination on new Fiber Optic Distribution Panels (FODPs).
  • All work must adhere to the 96th Communications Squadron Cyber Infrastructure Standards and Installation Specifications (CISIS), covering standards for patch panels, work area outlets, horizontal cable, fiber, grounding, labeling, and testing.

Performance Standards & Deliverables

All testing must comply with OFSTP-14, OFSTP-7, TIA-568-C.3, and TIA-526-7, with test equipment calibrated within one year. Required deliverables include ISP/OSP copper/fiber test reports and As-Built drawings in .PDF format. The Government will witness 10% sample testing, expanding to 100% if failures occur, and conduct a final QC inspection. Discrepancies must be corrected within five duty days.

Contract Details

  • Contract Type: Firm-Fixed-Price Definitive Contract
  • Set-Aside: 100% Small Business Set-Aside
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
  • Small Business Size Standard: $19.0 Million
  • Product Service Code: N059 (Installation Of Equipment: Electrical And Electronic Equipment Components)
  • Place of Performance: Building 15177, Eglin AFB, FL 32542

Submission & Evaluation

Offers are due by Thursday, May 7, 2026, at 10:00 A.M. CST. Evaluation will be based on Price and Technical Acceptability, specifically the ability to comply with the Performance Work Statement (PWS). Proposals must include pricing for all Contract Line-Item Numbers (CLINs) and a technical description of proposed items and services. Technical capability will be assessed based on corporate experience, operational capability, and technician qualifications. Offerors must be actively registered in SAM.gov. Questions should be directed via email to Brooke Socolofsky.

People

Points of Contact

Brooke SocolofskyPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 5, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
NIPR Network Drops and Multi-Mode (MM) Cable Installation Bldg 15177 | GovScope