NUWCDIVNPT Hull Demolition Project

SOL #: N6660426Q0125Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NUWC DIV NEWPORT
NEWPORT, RI, 02841-1703, United States

Place of Performance

Newport, RI

NAICS

Other Foundation (238190)

PSC

Demolition Of Structures Or Facilities (Other Than Buildings) (P500)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 20, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 20, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NUWC Division Newport, has issued a Combined Synopsis/Solicitation (N6660426Q0125) for the NUWCDIVNPT Hull Demolition Project. This Total Small Business Set-Aside seeks a contractor to provide all labor, equipment, and materials for the demolition and removal of a 2-piece steel hull structure at Naval Station Newport, RI. The estimated Rough Order of Magnitude (ROM) for this work is between $25,000 and $100,000. Proposals are due by March 20, 2026, at 2:00 PM EST.

Scope of Work

The contractor will demolish a large 2-piece structure, consisting of a hull component (approx. 18' H x 18' W x 16.5' L, 76,000 lbs) and a hatch (approx. 12' W x 9' L x 3.5' H, 12,000 lbs), located at Building 47, Naval Station Newport, RI. The scope includes developing and obtaining approval for a project-specific Mitigation Plan, protecting existing infrastructure, transporting all scrap metal and waste to a licensed disposal/recycling facility, obtaining necessary permits, providing disposal documentation, sorting recyclable metals, site cleanup, and a post-demolition safety inspection. Compliance with numerous federal, state, local, and DoD/Navy regulations, including security and OPSEC, is required. Proceeds from scrap metal sales will be factored into the contractor's price proposal.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Period of Performance: 60 calendar days from the date of contract award.
  • Place of Performance: Building 47, Naval Station Newport, Newport, RI 02841.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • Estimated Value (ROM): $25,000 - $100,000.
  • Davis-Bacon Act: Applicable, requiring adherence to prevailing wage rates for Rhode Island.

Submission & Evaluation

  • Response Due Date & Time: March 20, 2026, 2:00 PM EST.
  • Submission Method: Electronic email to Michael Ouellette (michael.n.ouellette.civ@us.navy.mil). The subject line must be "Quote for N66604-26-Q-0125 – [Your Company Name]".
  • Basis for Award: Lowest Price Technically Acceptable (LPTA).
  • Technical Acceptability Factors:
    • A draft project-specific Mitigation Plan addressing fire safety, environmental risks, work footprint, and emergency plan.
    • Evidence of at least two (2) similar projects (heavy structural demolition, industrial site work) completed within the past five (5) years.
  • Quote Package Requirements: Signed quote, completed pricing schedule, draft Mitigation Plan, relevant experience documentation, and completed FAR 52.212-3 (Offeror Representations and Certifications).
  • No Bid Bond or Liquidated Damages are required for this project.

Key Amendments & Notes

A site visit was held on March 4, 2026, and a log of attendees is available. Photos of the hull structure (Attachment #6) have been provided to offer visual context. The proposal acceptance period is 30-60 days.

People

Points of Contact

Michael OuellettePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
View
NUWCDIVNPT Hull Demolition Project | GovScope