OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2), CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project

SOL #: 69056725B000008Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Hood River, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 4, 2025
2
Last Updated
Mar 2, 2026
3
Submission Deadline
Feb 27, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, issued Solicitation No. 69056725B000008 for the CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project. This Firm Fixed-Price contract involved comprehensive sign and guardrail work across the Columbia River Gorge National Scenic Area in Oregon and Washington. This opportunity was a Total Small Business Set-Aside. The bid opening was held on February 27, 2026.

Scope of Work

This project spanned approximately 82.1 miles across Multnomah, Hood River, Wasco (OR) and Clark, Skamania, Klickitat (WA) Counties. Key deliverables included:

  • Installation and removal of sign systems: Thematic wood signs on various posts, sign panels, and shields.
  • Guardrail systems: Installation and maintenance of MGS, Type 2, Class B wood posts, ODOT Type 2A guardrails, and terminal sections.
  • Site preparation and restoration: Soil erosion control measures (fiber rolls), turf establishment, construction survey, and staking.
  • Traffic control: Implementation of temporary traffic control measures including barricades, flaggers, and construction signs.
  • Specialized tasks: Salvage of existing thematic sign panels and rock masonry bases, application of reactive colorant finishes, weathering agents, and painting.

Contract & Timeline

  • Contract Type: Firm Fixed-Price
  • Period of Performance: Work to commence within 10 calendar days of notice to proceed, with completion by December 15, 2026.
  • Estimated Value: The Engineer's Estimate for this project was $2,045,000.00.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Bid Opening Date: February 27, 2026, at 2:00 PM PT.

Submission & Evaluation

  • Submission: Bids were required to be submitted as printed copies to the address listed on SF 1442; electronic bids were not accepted.
  • Questions: General and technical questions were accepted until five business days before the due date. Technical questions were directed to wfl.plans-spec@dot.gov, and general questions to wfl.contracts@dot.gov.
  • Evaluation Criteria: Not explicitly detailed in the provided documents.

Amendments & Clarifications

  • Amendment A001 (Feb 12, 2026): Updated the Minimum Wage Schedule and replaced all plan sheets with Engineer Stamps.
  • Amendment A002 (Feb 20, 2026): Extended the bid opening date to February 27, 2026, and revised bid schedule item A0090 (Guardrail System) and specific plan sheets (B.1, C.16, C.17, D.1).
  • Q&A (Feb 20, 2026): Clarified guardrail specifications, staffing requirements, permitting, and staging.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
View
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Solicitation
Posted: Mar 2, 2026
Version 6
Solicitation
Posted: Feb 27, 2026
View
Version 5
Solicitation
Posted: Feb 20, 2026
View
Version 4
Solicitation
Posted: Feb 12, 2026
View
Version 3
Solicitation
Posted: Jan 20, 2026
View
Version 2
Pre-Solicitation
Posted: Oct 9, 2025
View
Version 1
Pre-Solicitation
Posted: Mar 4, 2025
View