P1625 MARSOC Storage and Training Facilities

SOL #: N4008526R9012Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 5, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 13, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for P1625 MARSOC Storage and Training Facilities at Camp Lejeune, NC. This project involves the construction of a 4,000 SF practical application classroom training facility and a 6,000 SF pre-engineered metal building. The estimated cost range is $5,000,000 to $10,000,000. This is a Total Small Business Set-Aside, but only specific General MACC Contractors listed in the solicitation are eligible to submit proposals. Proposals are due March 13, 2026, by 3:00 PM EST.

Scope of Work

This project, identified as "P1625 MARSOC Storage and Training Facilities" (Project No. 25-0029), encompasses the construction of two primary facilities:

  • ELIN 0001: A 4,000 SF practical application classroom training facility, including combat trauma training areas, as per provided drawings and specifications.
  • ELIN 0002: A 6,000 SF pre-engineered metal building with a standing seam metal roof, brick veneer, monolithic concrete foundation, floor slab, site work, and utilities, as per provided drawings and specifications. Detailed design criteria for civil, structural, architectural, plumbing, mechanical, electrical, and fire protection aspects are provided in the "BASIS OF DESIGN" document. Geotechnical reports outline subsurface conditions and foundation recommendations. HVAC systems must comply with BACnet standards and include DDC controls.

Contract & Timeline

  • Contract Opportunity Type: Combined Synopsis/Solicitation
  • Estimated Cost Range: $5,000,000 - $10,000,000
  • Period of Performance: 720 days after award
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Proposal Due Date: March 13, 2026, by 3:00 PM EST (as amended)
  • Published Date: March 5, 2026
  • Liquidated Damages: $880 per Calendar Day

Eligibility & Submission

  • Eligibility: This opportunity is restricted to ONLY THE GENERAL MACC CONTRACTORS listed on the General Requirements cover page of the solicitation.
  • Submission: Proposals must be submitted via email to Clifton.l.gaither.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Bond Requirements: Bid, payment, and performance bonds are required for proposals exceeding $150,000. An electronic copy of the bid bond is sufficient.
  • Acknowledgment: Offerors must acknowledge all amendments with their proposal submission to avoid rejection.

Key Amendments & Clarifications

  • Amendment 0005: Changed the proposal due date to March 13, 2026, 3:00 PM EST.
  • Amendment 0004: Clarified that only an electronic copy of the bid bond is required.
  • Amendment 0003: Provided clarifications on roofing specifications (PEMB standing seam) and floor coatings (clear sealer).
  • Amendment 0002: Scheduled a mandatory site visit for February 19, 2026, at 1:00 PM, requiring MARSOC access roster submission by February 17, 2026.
  • Amendment 0001: Clarified personnel roles (Quality Control Manager must be stand-alone; Superintendent and Safety and Health Officer can be combined if qualified) and replaced Section 01 31 50.

Evaluation

Award will be made on a Lowest Price basis. Offerors must provide pricing for all line items (ELIN 0001 and ELIN 0002), including all markups.

Additional Notes

  • Place of Performance: Camp Lejeune, NC.
  • Environmental Compliance: Contractors must adhere to the Contractor Environmental Guide for MCB Camp Lejeune, covering hazardous materials, waste disposal, stormwater management, and cultural resources.
  • Wage Determination: General Decision Number NC20260010 01/02/2026 (Building) applies.
  • Executive Orders: EO 13706 (Paid Sick Leave) and EO 13658 (Minimum Wage) provisions apply.

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 13, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View