P1625 MARSOC Storage and Training Facilities

SOL #: N4008526R9012Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 5, 2026
2
Last Updated
Apr 13, 2026
3
Submission Deadline
Apr 15, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the P1625 MARSOC Storage and Training Facilities project at MCB Camp Lejeune, NC. This Total Small Business Set-Aside opportunity is restricted to General MACC Contractors listed on the General Requirements cover page. The project involves constructing a practical application classroom training facility and a pre-engineered metal building. The estimated value is between $5,000,000 and $10,000,000. Proposals are due by April 15, 2026, at 3:00 PM.

Scope of Work

This project entails the construction of two primary facilities:

  • A 4,000 SF practical application classroom training facility, including combat trauma training areas.
  • A 6,000 SF pre-engineered metal building featuring a standing seam metal roof, brick veneer, monolithic concrete foundation, and floor slab. The scope also includes associated site work, utilities, and various building systems. Detailed drawings and specifications are provided in the solicitation attachments.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to General MACC Contractors listed on the General Requirements cover page.
  • Estimated Value: $5,000,000 - $10,000,000
  • Contract Completion: 720 days after award
  • Contract Type: Lowest Price basis for award (suggests Fixed-Price)
  • Liquidated Damages: $880 per Calendar Day
  • Product Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)

Key Requirements & Clarifications

  • Amendments: Twelve amendments have been issued, with the latest (Amendment 0012) providing final clarifications. Bidders must acknowledge all amendments.
  • Air Barriers: Specification sections 07 27 10 and 07 27 19 related to air barriers must remain in the project.
  • Progress Payments: Conduits, gypsum board, glass, and insulation will not be considered for progress payments.
  • Fire Protection: A fire pump is to be excluded from the design.
  • Roofing: Pre-Engineered Metal Building (PEMB) standing seam roof panels must comply with contract specifications (16" panel with vertical seam leg).
  • Floor Coating: The three coats required for the floor should be a clear sealer, not an epoxy.
  • Environmental & Safety: Contractors must comply with the Contractor Environmental Guide for MCB Camp Lejeune. A security briefing with MARSOC Security is required prior to construction.
  • Submittals: Electronic bid bonds are required; no paper copy needed. eCMS will not be functional for this project after award.
  • Permits: Bidders are responsible for obtaining all necessary permits, fees, and inspections.

Submission & Evaluation

Contacts

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 14
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
Version 13
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 12Viewing
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
Version 11
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 10
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 13, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View