P919 - Phase I, Bulk Fuel Tank Farm Improvements, Naval Station Rota, Spain

SOL #: N6247026R0006Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM ATLANTIC
NORFOLK, VA, 23508-1278, United States

Place of Performance

Rota, ES-CA, Spain

NAICS

Oil and Gas Pipeline and Related Structures Construction (237120)

PSC

Construction Of Fuel Supply Facilities (Y1NA)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 4, 2025
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Feb 13, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM ATLANTIC is soliciting proposals for P919 - Phase I, Bulk Fuel Tank Farm Improvements at Naval Station Rota, Spain. This project involves significant construction and infrastructure upgrades to fuel storage and pipeline systems. Proposals are due by February 13, 2026, at 2:00 PM Norfolk, VA local time.

Purpose & Scope

This solicitation, issued on an UNRESTRICTED basis, seeks a contractor for the "P919 Bulk Tank Fuel Farm Improvements and Pipeline Phase 1." The project's core involves constructing two new 50,000-barrel "cut-and-cover" fuel tanks, each with dedicated pump vaults and associated pumping equipment, and a standby generator. The scope also includes extensive site and civil work, removal of out-of-service piping, HazMat surveying, and the installation of a new 18-inch diameter fuel pipeline with metering to transport fuel from Pier 3 to the Bulk Tank Farm. Horizontal Directional Drilling (HDD) will be utilized for rerouting existing pipelines under the Rio Salado River. A cathodic protection system for tanks and pipelines, along with electrical utilities (distribution, communications, site lighting, lightning protection, and cathodic protection), are integral parts of the project. An optional CLIN 0004 covers the F76 Fuel Line from Pier 3 to the Bulk Storage Fuel Farm Improvements.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: 909 calendar days from Notice to Proceed
  • Estimated Magnitude: Between $25,000,000 and $100,000,000
  • NAICS Code: 237120 (Construction Of Fuel Supply Facilities), Size Standard: $45M
  • Set-Aside: Unrestricted (Full and Open Competition)
  • Key Requirements: Offerors must be registered in SAM, comply with Spanish contracting law and classification requirements (Attachment G), and provide a 50% Performance Guarantee or Performance and Payment Bonds within 10 days of award. Civil Liability insurance (Attachment L) is also required.

Submission & Evaluation

  • Proposal Due Date: February 13, 2026, at 2:00 PM Norfolk, VA local time.
  • Submission Method: Electronic via PIEE Solicitation Module.
  • Evaluation Factors: Award will be based on a "best value tradeoff" process. Non-price factors are significantly more important than price and include:
    • Factor 1: Construction Experience (relevant projects minimum $10M total contract value)
    • Factor 2: Safety (Acceptable/Unacceptable)
    • Factor 3: Technical Solution
    • Factor 4: Past Performance
  • Pricing: Offerors must submit prices for all CLINs (0001 through 0004); failure to do so will result in rejection.

Key Attachments & Information

Detailed technical specifications, drawings, and forms are provided across numerous attachments (e.g., Attachments B, C, D, E, F, M, N). These cover pricing schedules, construction experience data sheets, past performance questionnaires, technical specifications for various systems (mechanical, electrical, cathodic protection), and personnel access forms for Naval Station Rota. A site visit was held on December 16, 2025.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Solicitation
Posted: Mar 3, 2026
View
Version 8
Solicitation
Posted: Mar 2, 2026
View
Version 7
Solicitation
Posted: Feb 25, 2026
View
Version 6
Solicitation
Posted: Feb 11, 2026
View
Version 5Viewing
Solicitation
Posted: Jan 29, 2026
Version 4
Solicitation
Posted: Jan 9, 2026
View
Version 3
Solicitation
Posted: Jan 6, 2026
View
Version 2
Solicitation
Posted: Dec 1, 2025
View
Version 1
Solicitation
Posted: Nov 4, 2025
View