P993/995, F-35 Aircraft Sustainment Center and Composite Repair Facility located at the Marine Corps Air Station (MCAS) Cherry Point, NC

SOL #: N4008526R0002Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Cherry Point, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Airfield Structures (Y1BZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 5, 2026
2
Last Updated
Jun 11, 2026
3
Submission Deadline
May 27, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the DESIGN-BID-BUILD construction of the P993/995 F-35 Aircraft Sustainment Center and Composite Repair Facility at Marine Corps Air Station (MCAS) Cherry Point, NC. This is a Segment II acquisition, with ECC Atlantic Construction and Walsh Federal pre-qualified as offerors. The project involves significant construction to support F-35 aircraft sustainment and advanced composite repair. Proposals are due by May 27, 2026, at 2:00 PM EDT.

Scope of Work

The project encompasses two major facilities:

  • F-35 Sustainment Center (P993): A 255,461 SF depot-level hangar for 20 F-35 aircraft, including maintenance bays, 4 paint booths, administrative space, aircraft part modification and tool shops, and an ICD705-compliant secure area. The main facility features precast structural concrete, a pile-supported foundation, slab on grade, and a cross-laminated timber roof deck.
  • Composite Repair Facility (P995): A 105,755 SF consolidated depot-level facility for advanced composites and rotor blade repair. It includes disassembly, parts kitting, production control, clean/dirty rooms, bonding rooms, classrooms, engineering/laboratory space, and a rotor blade repair shop. Site development includes utility improvements for Hancock Village, a taxiway with a bridge, and an aircraft parking apron.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Magnitude: Over $500,000,000
  • Period of Performance: 1,461 calendar days for completion after 15 days for commencement.
  • Set-Aside: Not a prime set-aside; however, it includes small business subcontracting targets of 40% overall SB, 5% SDB, 3% HUBZone SB, 9% WOSB, and 5% SDVOSB. A minimum 20% total small business subcontracting commitment is required.
  • Pre-qualified Offerors: ECC Atlantic Construction and Walsh Federal.

Key Requirements & Updates

  • CMMC Compliance: P993 requires CMMC Level 2, and P995 requires CMMC Level 1. P993 drawings and specifications have been reissued without CUI designation via Amendment 0006, and Division 1 specifications for both P993 and P995 have also been reissued without CUI.
  • Evaluation Factors: For Segment II, Management Approach & Schedule and Small Business Utilization are of equal importance to each other and approximately equal to price for construction services.
  • Site Conditions: Analytical data for water and soil contamination (petroleum, metals, SVOCs, PFAS) at P-995/P-993 sites is available. Land Use Control (LUC) plans are not required for work within the project's Limit of Disturbance.
  • Technical Specifications: Numerous amendments have revised drawings and specifications for both facilities, including details on interior finishes, aerospace X-ray testing equipment, roller window shades, utility monitoring systems, and structural elements. Updated wage determinations are also incorporated.

Submission & Contact

  • Proposal Due: May 27, 2026, at 2:00 PM EDT.
  • Submission: Electronically via PIEE in PDF format, with price and non-price proposals in separate files.
  • Contact: Brittany Cristelli, brittany.cristelli@navy.mil, 757-341-1978.

People

Points of Contact

Brittany CristelliPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View
Download
Download

Versions

Version 16
Solicitation
Posted: Jun 11, 2026
View
Version 15Viewing
Solicitation
Posted: May 22, 2026
Version 14
Solicitation
Posted: May 20, 2026
View
Version 13
Solicitation
Posted: May 18, 2026
View
Version 12
Solicitation
Posted: May 14, 2026
View
Version 11
Solicitation
Posted: May 5, 2026
View
Version 10
Solicitation
Posted: Apr 24, 2026
View
Version 9
Solicitation
Posted: Apr 22, 2026
View
Version 8
Solicitation
Posted: Apr 15, 2026
View
Version 7
Solicitation
Posted: Apr 10, 2026
View
Version 6
Sources Sought
Posted: Mar 12, 2026
View
Version 5
Solicitation
Posted: Mar 11, 2026
View
Version 4
Solicitation
Posted: Mar 11, 2026
View
Version 3
Solicitation
Posted: Mar 9, 2026
View
Version 2
Solicitation
Posted: Mar 6, 2026
View
Version 1
Special Notice
Posted: Jan 5, 2026
View