Painting and Flooring Bldgs S960, S962, 1069, etc.

SOL #: N40085-26-R-9026Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 24, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Painting and Flooring Services across multiple buildings (S960, S962, 1069, FC280, 1039, FC375, 60, FC330, TT19, HP5, A71, and 111) at Marine Corps Base Camp Lejeune, North Carolina. This is a Combined Synopsis/Solicitation set aside for Total Small Business. Proposals are due by April 24, 2026, at 2:00 PM EST.

Scope of Work

This project, identified as Project # 25-0405 (Solicitation # N40085-26-R-9026), requires comprehensive painting and flooring services. The scope includes:

  • General Painting: Repairing surfaces, cleaning mold/mildew, applying finish compounds, matching existing colors, replacing damaged trim, priming, and applying specified latex paints (semi-gloss, eggshell/satin, high gloss) to various interior and exterior surfaces. Special attention is given to mildew-resistant paint for bathrooms and specific application methods (e.g., roller/brush only for Building HP5). Lead paint areas require scraping and encapsulation, not abatement, with a hazardous materials plan.
  • Flooring Installation: Installing non-skid epoxy flooring in engine dyno bays of Building FC280. Removing existing carpet and vinyl cove base in Building 1039 for replacement with Tarkett Crafted Plank Provence. Removing existing carpet and VCT in Buildings A71 and 111, sealing floors, and installing Tarkett Winter Gray carpet tiles. Detailed specifications are provided for carpeting (e.g., TARR, static control, indoor air quality) and Luxury Vinyl Tile (LVT) (e.g., ASTM standards, surface flatness, indoor air quality).
  • Surface Preparation: Protecting and moving/resetting furniture, removing/reinstalling electrical/data covers, painting over/replacing stenciled signage, and cleaning spills. Concrete floors require cleaning, sealing, and application of Sherwin Williams Rexthane I Floor paint.
  • General Requirements: The facility will remain operational, requiring minimal interference. The contractor is responsible for managing existing work, protecting vegetation and utilities, and identifying underground facilities.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation
  • Estimated Cost Range: Between $500,000 and $1,000,000
  • Contract Completion: 300 days after award (extended by Amendment 0001)
  • Liquidated Damages: $880 per Calendar Day
  • Basis for Award: Lowest Price
  • Proposal Acceptance Period: 60 days from receipt of offers
  • Proposal Due Date: April 24, 2026, 2:00 PM EST
  • RFI Cut-off: April 10, 2026, 3:00 PM EST (now passed)

Eligibility & Requirements

This opportunity is restricted to M&R MACC Contractors listed under specific contract numbers (N40085-25-D-2516, N40085-25-D-2517, N40085-25-D-2518, N40085-25-D-2519). Bidders must acknowledge Amendment 0001 with their proposal. Requirements include bid, payment, and performance bonds based on proposal value, compliance with Buy American provisions, and adherence to the Marine Corps Base Camp Lejeune Contractor Environmental Guide. Submittals for product specifications and technical data are required.

Key Amendments

Amendment 0001 clarified specific building requirements (e.g., government property movement for painting in S960/S962, painting all interior surfaces in 1069, specific epoxy flooring areas in FC280, field verification for quantities, occupant responsibility for personal items, roller/brush only for HP5, and detailed flooring instructions for A71 and 111). It also extended the project timeframe by 60 days to 300 days.

Contact Information

Proposals should be emailed to donna.l.mason31.civ@us.navy.mil and Regenia.d.guest.civ@us.navy.mil.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View