Painting and Flooring Bldgs S960, S962, 1069, etc.

SOL #: N40085-26-R-9026Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 24, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Painting and Flooring Services at multiple buildings (S960, S962, 1069, etc.) located at Marine Corps Base Camp Lejeune, NC. This is a Total Small Business Set-Aside opportunity, with proposals due by April 24, 2026, at 2:00 PM EST.

Scope of Work

This project, Solicitation N40085-26-R-9026 (Project 25-0405), requires comprehensive painting and flooring services.

  • Painting: Includes repair of cracks/holes, cleaning mold/mildew, applying finish compound, matching existing colors, replacing damaged trim, priming, and applying specified latex paints to various interior and exterior surfaces. Specific requirements include painting all previously painted interior surfaces in Building 1069 and using roller/brush only (no spraying) in Building HP5.
  • Flooring: Installation of non-skid epoxy flooring in two engine dyno bays and the control room of Building FC280. Removal of existing carpet and vinyl cove base in Building 1039, replaced with Tarkett Crafted Plank Provence. Removal of existing carpet and VCT in Buildings A71 and 111, followed by floor sealing and installation of Tarkett Winter Gray carpet tiles.
  • Contractor Responsibilities: Moving furniture, protecting existing structures, removing/reinstalling electrical covers, painting over/replacing stenciled signage, and cleaning spills.
  • Special Conditions: For areas with lead paint, the intent is to scrape and encapsulate, not abate; a hazardous materials plan is required. All work must comply with the Marine Corps Base Camp Lejeune Contractor Environmental Guide and detailed technical specifications for materials and application.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (RFP)
  • Estimated Cost Range: Between $500,000 and $1,000,000
  • Contract Completion: 300 days after award (extended by Amendment 0001)
  • Liquidated Damages: $880 per Calendar Day
  • Basis for Award: Lowest Price
  • Eligibility: Restricted to M&R MACC Contractors listed on specific contracts (N40085-25-D-2516, -2517, -2518, -2519).
  • Bonds: Bid bonds (20% for >$150K), Payment bonds (>$35K), and Performance bonds (>$150K) are required based on proposal value.
  • Requirements: Buy American Requirement-Construction Materials provision applies.

Key Dates & Submission

Important Notes

Offerors are advised that funding may not be available, and no award will be made if funds are not available. No costs will be reimbursed for proposal efforts. Amendments 0001 and 0002 have been issued, providing clarifications, RFI answers, and extending the project timeframe. Bidders must acknowledge receipt of all amendments with their proposal.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View