Painting and Flooring Bldgs S960, S962, 1069, etc.

SOL #: N40085-26-R-9026Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
May 29, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy (NAVFACSYSCOM MID-ATLANTIC) is soliciting proposals for Painting and Flooring services across multiple buildings (S960, S962, 1069, etc.) at Camp Lejeune, NC. This is a Combined Synopsis/Solicitation under a Total Small Business Set-Aside (FAR 19.5), specifically restricted to pre-qualified M&R MACC Contractors. The estimated value is between $500,000 and $1,000,000. Proposals are due May 29, 2026.

Scope of Work

The project involves comprehensive painting and flooring services. Painting includes interior and exterior surfaces, addressing cracks, holes, mold/mildew, and applying specified coats of latex paint to various substrates. Flooring work encompasses installing non-skid epoxy in Building FC280 engine dyno bays, Tarkett Crafted Plank Provence and vinyl cove base in Building 1039, and Tarkett Winter Gray carpet tiles with vinyl cove base in Buildings A71 and 111. Surface preparation, furniture movement, and protection of existing components are required. For areas with lead paint, the scope mandates encapsulation, not abatement, and requires a hazardous materials plan. The project timeframe is 300 days after award, extended by Amendment 0001. Work will be performed across various buildings at Marine Corps Base Camp Lejeune, NC, which will remain operational throughout the construction period.

Contract Details & Evaluation

This opportunity is a Combined Synopsis/Solicitation. Award will be made on a Lowest Price basis. Liquidated damages are set at $880 per calendar day. Bid bonds are required for proposals over $35,000, with payment and performance bonds necessary for proposals exceeding $35,000 and $150,000, respectively. The Buy American Requirement applies to construction materials. Eligibility is strictly limited to contractors currently on the specified M&R MACC list (N40085-25-D-2516, N40085-25-D-2517, N40085-25-D-2518, N40085-25-D-2519).

Key Requirements & Special Considerations

Contractors must submit manufacturer's product specifications and technical data. Coordination with building points of contact is essential for access and scheduling. Environmental compliance is critical, requiring adherence to the MCB Camp Lejeune Contractor Environmental Guide. An asbestos inspection report for Building 111 is provided, which is crucial for planning work in that facility. All bidders must acknowledge receipt of all amendments, particularly Amendment 0003, which extended the proposal due date.

Submission & Contact

Proposals are due by May 29, 2026, 6:00 PM UTC. Submissions should be emailed to both Donna Mason (donna.l.mason31.civ@us.navy.mil) and Regenia D. Guest (Regenia.d.guest.civ@us.navy.mil). For inquiries, contact Donna Mason at 910-451-2582.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View