Pre-Solicitation Notice and Draft RFP for Environmental Remediation Services (ERS) Single Award Task Order Contract (SATOC) For the Shaw Air Force Base Optimized Remediation Contract (ORC)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Savannah District (SAS), has issued a Pre-Solicitation Notice and Draft RFP for a $40M Environmental Remediation Services (ERS) Single-Award Task Order Contract (SATOC) for the Shaw Air Force Base Optimized Remediation Contract (ORC). This opportunity is a 100% Total Small Business Set-Aside under NAICS 562910 and will result in a Firm Fixed Price contract. The purpose of this pre-solicitation is to provide industry with information and solicit feedback on the Draft RFP. Feedback on the Draft RFP is requested via ProjNET. A site visit is scheduled for March 5, 2026, with attendee lists due by February 23, 2025.
Scope of Work
The objective is to achieve site closure (SC) for unrestricted residential use at Shaw Air Force Base. The ORC encompasses 18 Installation Restoration Program (IRP) sites, including Operations and Maintenance (O&M) for two Groundwater Treatment Plants. The PWS details a comprehensive range of environmental remediation activities, including investigation, design, construction, operation, and optimization of remedies. Key tasks involve achieving site-specific Performance Objectives (POs), managing and disposing of investigation-derived waste (including PFAS-contaminated media), conducting 1,4-Dioxane investigations, and developing Conceptual Site Models (CSMs) and exit strategies. The contract requires adherence to federal, state, and local regulations, DoD/AF instructions, and strict Health and Safety Plans (HSP).
Contract & Timeline
- Contract Type: Single-Award Task Order Contract (SATOC), Firm Fixed Price
- Estimated Value: $40,000,000
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS: 562910 (Environmental Remediation Services)
- Ordering Period: 7 years base + one 6-month option period
- Draft RFP Published: February 19, 2026
- Site Visit Attendee List Due: February 23, 2025, 17:00 ET
- Site Visit Date: March 5, 2026, 10:00 AM ET at Shaw AFB
- Final Solicitation Anticipated: On or about March 12, 2026
- Proposal Submission: Exclusively via PIEE Solicitation Module (instructions provided in Draft RFP)
Additional Notes
Industry feedback on the Draft RFP is encouraged through ProjNET. The final solicitation will be issued electronically, and the proposal due date will be specified at that time. Offerors must register on PIEE and follow specific instructions for electronic proposal submission. The PWS Enclosure 2C provides crucial site-specific Government Furnished Information (GFI) detailing environmental conditions and regulatory considerations at Shaw AFB, which is vital for understanding the scope and complexities of the work.