PREMISE WIRING B145

SOL #: FA462626Q0009Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4626 341 CONS LGC
MALMSTROM AFB, MT, 59402-6863, United States

Place of Performance

Malmstrom AFB, MT

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Electrical Hardware And Supplies (5975)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 6, 2026
2
Last Updated
Apr 17, 2026
3
Submission Deadline
Apr 17, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a Premises Wiring Upgrade in Building 145 (B145) at Malmstrom AFB, MT. This project involves engineering, furnishing, installing, and testing new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling, along with associated infrastructure. This is a Total Small Business Set-Aside. Proposals are due April 17, 2026, at 1:00 PM MST.

Scope of Work

The contractor will Engineer, Furnish, Install, and Test (EFI&T) a comprehensive premises wiring upgrade. This includes:

  • Installation of new plenum-rated Cat-6 and OM4 MM fiber cabling, including drop outlets, pathways, and grounding, as detailed in Attachment A (Layout Drawings).
  • Installation and replacement of communications racks/cabinets.
  • Installation of new AC power with Power Distribution Units (PDUs).
  • Removal and disposal of all existing outdated and abandoned-in-place Cat-3/5 and MM fiber cabling and residual materials.
  • Provision of all necessary equipment, tools, supplies, materials, hardware, licensing, documentation, and services.
  • Compliance with current ANSI/TIA telecommunications installation and testing commercial standards, as well as Malmstrom AFB construction standards. All upgraded equipment must be new and maintainable for at least five years.

Key deliverables include As-Built Drawings, Work Schedule, Status Reports, Meeting Minutes, Cutover and Test Plan, and a Test Report. A one-year warranty for workmanship and installed equipment is required.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: 180 days from the date of award.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code (PSC): 5975 - Electrical Hardware And Supplies
  • NAICS: 238210 - Electrical Contractors and Other Wiring Installation Contractors (Size Standard: $19,000,000)
  • Evaluation: Quotes will be evaluated on price and conformance to the Performance Work Statement (PWS). Award will be made to the offer providing the best value to the government, based on an evaluation of the three lowest-priced quotes.

Key Dates & Contacts

  • Proposal Due Date: April 17, 2026, at 1:00 PM MST.
  • Published Date: April 9, 2026.
  • Site Visit: A site visit was held on April 7, 2026, at 10:00 AM MST.
  • Primary Contact: Barek Webster, barek.webster@us.af.mil, 406-731-4004
  • Secondary Contact: Charles McClintic, charles.mcclintic@us.af.mil, 406-731-4463

Additional Notes

Clarifications indicate that approximately 90% of the work involves removing and replacing existing cabling, with some new drops in specific areas. The government prefers ivory for faceplates/jacks, aqua for OM4 MM fiber, blue for NIPR Cat-6, and red for SIPR Cat-6. Non-plenum cabling is acceptable for general office spaces. The contractor is responsible for providing independent storage for materials. All unused copper cabling must be removed from the building. Eight SIPR drops are to be replaced.

People

Points of Contact

Charles McClinticSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Apr 17, 2026
View
Version 6Viewing
Solicitation
Posted: Apr 9, 2026
Version 5
Solicitation
Posted: Apr 9, 2026
View
Version 4
Solicitation
Posted: Apr 6, 2026
View
Version 3
Solicitation
Posted: Apr 2, 2026
View
Version 2
Solicitation
Posted: Mar 30, 2026
View
Version 1
Solicitation
Posted: Mar 6, 2026
View