PREMISE WIRING B145
SOL #: FA462626Q0009Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA4626 341 CONS LGC
MALMSTROM AFB, MT, 59402-6863, United States
Place of Performance
Malmstrom AFB, MT
NAICS
Electrical Contractors and Other Wiring Installation Contractors (238210)
PSC
Electrical Hardware And Supplies (5975)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 6, 2026
2
Last Updated
Apr 17, 2026
3
Submission Deadline
Apr 24, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for a Premises Wiring Upgrade in Building 145 (B145) at Malmstrom AFB, MT. This project involves engineering, furnishing, installing, and testing (EFI&T) new plenum-rated Cat-6 and OM4 multimode fiber cabling, along with the removal of existing outdated infrastructure. This is a Total Small Business Set-Aside. Proposals are due April 24, 2026.
Scope of Work
The contractor will EFI&T a premises wiring upgrade, including new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145. This encompasses:
- Installation and replacement of communications (comms) racks/cabinets.
- Installation of new AC power with Power Distribution Units (PDUs) and comms rack/cabinet grounding.
- Removal and disposal of all existing outdated and abandoned-in-place Cat-3/5 and MM fiber cabling, along with residual materials.
- Installation of new Cat-6 and OM4 MM fiber drop layouts as detailed in Attachment A (Layout Drawings).
- The project will involve approximately 90% removal and replacement of existing cabling, with some new drops in areas where cabling is currently exposed.
- Specific clarifications include: preferred ivory for faceplates/jacks, aqua for OM4 MM fiber, blue for NIPR CAT6, and red for SIPR CAT6. Eight SIPR drops will be redirected to CEL-2.
- The work will require a phased plan to minimize service disruption.
Contract & Timeline
- Type: Solicitation (Firm Fixed Price)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5975 (Electrical Hardware And Supplies)
- Period of Performance: 180 days (extended by Amendment 0002)
- Response Due: April 24, 2026, 1:00 PM MST (extended by Amendment 0003)
- Published Date: April 17, 2026 (latest amendment)
- Place of Performance: Malmstrom AFB, MT 59402
Evaluation & Requirements
- Evaluation: Quotes will be evaluated on price and conformance to the Statement of Objectives (SOO). Award will be made to the quote providing the best value to the government, with only the three lowest-priced quotes evaluated.
- Key Requirements: Compliance with ANSI/TIA telecommunications standards, Malmstrom AFB construction standards, and specific labeling standards (Appendix B). All equipment must be new and maintainable for at least five years.
- Wage Determination: Wage Determination 20155391, Revision 26, is incorporated, specifying minimum wage rates and fringe benefits for various occupations in Cascade County, Montana.
- Deliverables: As-Built Drawings, Work Schedule, Status Reports, Meeting Minutes, Cutover and Test Plan, and Test Report.
- Site Visit: A site visit was held on April 7, 2026, at 10:00 MST at 7015 Goddard Dr., Bldg. 145, Malmstrom AFB, MT 59402.
Contact Information
- Primary: Barek Webster (barek.webster@us.af.mil, 4067314004)
- Secondary: Charles McClintic (charles.mcclintic@us.af.mil, 4067314463)
People
Points of Contact
Barek WebsterPRIMARY
Charles McClinticSECONDARY
Files
Versions
Version 7Viewing
Solicitation
Posted: Apr 17, 2026
Version 6
Solicitation
Posted: Apr 9, 2026
Version 5
Solicitation
Posted: Apr 9, 2026
Version 4
Solicitation
Posted: Apr 6, 2026
Version 3
Solicitation
Posted: Apr 2, 2026
Version 2
Solicitation
Posted: Mar 30, 2026
Version 1
Solicitation
Posted: Mar 6, 2026