R09 Dam Early Warning System

SOL #: 12445526Q0029Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance Of Dams (Z1KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 24, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the R09 Dam Early Warning System project, a Total Small Business Set-Aside. This opportunity requires contractors to upgrade, install, relocate, and/or repair early warning systems on eighteen (18) high or significant hazard potential dams across seven National Forests. The anticipated award is a Firm Fixed Price (FFP) purchase order with an estimated value between $100,000 and $250,000. Quotes are due by April 24, 2026, at 5:00 P.M. Eastern.

Scope of Work

The contractor will furnish all labor, materials, equipment, supervision, and transportation for comprehensive early warning system services. Key requirements include:

  • Installation of new Early Warning Systems and Rain Gauges.
  • Repair and upgrade of existing Early Warning Systems.
  • Relocation of Early Warning Systems.
  • Servicing, cleaning, and calibrating Rain Gauge Sensors. These tasks will be performed at specific dam locations within the Hoosier, Huron-Manistee, Mark Twain, Monongahela, Shawnee, Wayne, and White Mountain National Forests. Systems must collect and transmit water level and rainfall data via satellite or cellular, allow remote monitoring, send instant alarms, and operate on solar power with battery backup.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Anticipated Award: Firm Fixed Price (FFP) purchase order
  • Estimated Magnitude: $100,000 to $250,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors ($19 Million size standard)
  • Period of Performance: May 2, 2026, to May 2, 2027. Work is to commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 365 calendar days after NTP.
  • Quote Submission Deadline: April 24, 2026, at 5:00 P.M. Eastern Time. Quotes must be emailed to Kevin.Brown2@usda.gov.
  • Questions Deadline: April 20, 2026, at 5:00 P.M. Eastern Time. Submit questions via email to Kevin.Brown2@usda.gov.
  • Offer Acceptance Period: Offerors must hold prices firm for 90 calendar days from the offer receipt date.

Evaluation Criteria

Award will be made to the offeror representing the best value to the Government, primarily based on the lowest price. Acceptability will be determined by compliance with the solicitation requirements, and responsibility will be assessed by the Contracting Officer, considering factors such as past performance and financial health.

Additional Notes

No scheduled site visit is planned; however, vendors are encouraged to visit the sites independently. The solicitation incorporates numerous FAR clauses by reference. Various wage determinations for the relevant states (Illinois, Michigan, Indiana, West Virginia, Missouri, Ohio, New Hampshire) are provided as attachments and must be considered for accurate labor cost estimation.

People

Points of Contact

Kevin BrownPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View