Recreational Center (VW) pool repairs

SOL #: 19CF2026Q0008Combined Synopsis/Solicitation

Overview

Buyer

State
State, Department Of
US EMBASSY BRAZZAVILLE
WASHINGTON, DC, 20520, United States

Place of Performance

Brazzaville, Congo

NAICS

Other Services to Buildings and Dwellings (561790)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 14, 2026, 11:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Embassy in Brazzaville is soliciting quotes for Recreational Center (Villa Washington) pool repairs in Brazzaville, Congo. This opportunity, identified as a Combined Synopsis/Solicitation, seeks a contractor to perform comprehensive renovation and repair services for the embassy's swimming pool. The government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. Quotations are due by May 14, 2026, at 11:00 AM UTC.

Scope of Work

The required services include:

  • Comprehensive renovation of the pool structure, recirculation, plumbing, and electrical systems.
  • Restoration of the pool deck, including erosion control and addressing sinkholes.
  • Removal of existing wall sealant, depth wall, and bottom floor.
  • Resurfacing and installation of new ceramic tiles (color to be approved).
  • Correction of piping leaks and ensuring proper functioning of pump room equipment.
  • Installation of new features such as deck markings, safety signage (English and host country language), GFCI protected power outlets, white LED pool spotlights, stainless-steel handrails, and underwater lights.
  • Replacement of all pool equipment in the technical room.
  • Provision of an Emergency Eyewash Station and a maintenance kit including an automatic electric pool cleaner.
  • All work must comply with local and US Standard construction industry practices, including OSHA 2007, US Army Corps of Engineers, ISPSC, ADA, NFPA 70, and NFPA70E.

Contract & Timeline

  • Contract Type: Contract/Purchase Order
  • Period of Performance: Estimated two (2) calendar months (60 calendar days).
  • Estimated Value: Between $100,000 and $250,000.
  • Set-Aside: None specified.
  • Quotations Due: May 14, 2026, 11:00 AM UTC.
  • Published Date: May 7, 2026.

Eligibility & Evaluation

Offerors must be technically qualified and financially responsible. Key eligibility requirements include:

  • Understanding English.
  • Established business presence in the Congo (or plans to establish within 30 days of award).
  • SAM registration.
  • Prior construction experience.
  • Necessary personnel, equipment, and financial resources.
  • Local licenses, permits, and insurance.
  • Ability to obtain performance security.
  • No adverse criminal record or conflicting political/business affiliations. Award will be made to the lowest priced, acceptable, responsible quoter, based on initial proposals, though discussions may be held.

Submission Requirements

Submissions must be in English and sent electronically to BrazzavilleProcurement@state.gov. Required documents include SF-18, Section A (Pricing), Section L (Representations and Certifications), and additional information as required in Section J. File size must not exceed 30MB.

Additional Notes

Contractors are advised to visit the site to develop their proposal. A preconstruction conference will be held 10 days after contract award. Amendments have added a checklist and removed mentions of pool heating functionality.

People

Points of Contact

Chilango GlhanePRIMARY
Charlem ISSOMBOSECONDARY

Files

Files

Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 7, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View