Recreational Center (VW) pool repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Embassy in Brazzaville is soliciting quotes for Recreational Center (Villa Washington) pool repairs in Congo. This opportunity requires comprehensive renovation services, including structural, plumbing, electrical, and deck restoration, for the embassy's swimming pool. The government intends to award a contract/purchase order to the lowest priced, acceptable, and responsible quoter. Quotes are due by May 14, 2026, at 11:00 AM UTC.
Scope of Work
The contractor will be responsible for a complete renovation of the Villa Washington swimming pool. Key tasks include:
- Removal of existing wall sealant, depth wall, and bottom floor.
- Resurfacing and installation of new, non-corrosive, humidity-resistant ceramic tiles (color to be approved).
- Correction of piping leaks and ensuring proper functioning of plumbing and electrical equipment in the pump room.
- Comprehensive renovation of the pool structure, recirculation, plumbing, and electrical systems.
- Restoration of the pool deck, including erosion control, debris/trash removal, and covering with travertine with a suitable slope for drainage.
- Installation of deck markings, stainless-steel handrails (one at deep end, two at shallow end), and three underwater lights on a sun sensor/timer.
- Replacement of white LED pool spotlights and all pool equipment in the technical room.
- Installation of GFCI protected power outlets (10mA) and an Emergency Eyewash Station.
- Ensuring water circulation for wading and adult pools is separate, and pool drainage complies with Virginia Graham Baker anti-entrapment requirements.
- Consideration for accessibility for physically disabled persons and installation of safety signage (POOL RULES) in English and host country language.
- Testing and commissioning of the entire system and provision of a maintenance kit, including an automatic electric pool cleaner.
- All work must adhere to local and US Standard construction industry practices, including OSHA 2007, US Army Corps of Engineers, ISPSC, ADA, NFPA 70, and NFPA70E.
Contract Details
- Contract Type: Contract/Purchase Order (anticipated to be fixed-price).
- Period of Performance: Estimated two (2) calendar months (60 calendar days).
- Estimated Value: Between $100,000 and $250,000.
- Set-Aside: None specified.
Submission & Evaluation
- Quotations Due: May 14, 2026, at 11:00 AM UTC.
- Submission Method: Electronically to BrazzavilleProcurement@state.gov.
- Format: MS-Word 2007/2010, MS-Excel 2007/2010, or Adobe Acrobat (pdf). File size must not exceed 30MB; larger submissions require separate emails.
- Required Documents: SF-18, Section A (Pricing), Section L (Representations and Certifications), and additional information as required in Section J.
- Evaluation: Award will be made to the lowest priced, acceptable, responsible quoter, based on initial proposals, though discussions may be held.
Eligibility Requirements
Offerors must be technically qualified and financially responsible, demonstrating:
- Understanding of English.
- Established business presence in the Congo (or plans to establish within 30 days of award).
- SAM registration.
- Prior construction experience, with a minimum of five years in pool structural construction and finishes, and three references for similar jobs.
- Necessary personnel, equipment, and financial resources.
- Local licenses/permits and local insurance.
- Ability to obtain performance security.
- No adverse criminal record or political/business affiliations contrary to U.S. interests.
Amendments & Notes
- Amendment 0001 added a checklist on page 24.
- Amendment 0002 removed mentions of pool heating functionality (Page 8, Section 4.3.8) as it is no longer needed. Offerors must acknowledge receipt of all amendments.
- Contractors are advised to visit the site to develop their proposal. A preconstruction conference will be held 10 days after contract award.
- Deliverables include Securities/Insurance, Construction Schedule, Personnel Biographies, and Payment/Completion Requests.