J--Rehab Well no. 2 at Yosemite Valley - Yosemite NP

SOL #: 140P8526Q0023Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
PWR SF/SEA MABO(85000)
SAN FRANCISCO, CA, 94104, United States

Place of Performance

Place of performance not available

NAICS

Water Supply and Irrigation Systems (221310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Water Purification And Sewage Treatment Equipment (J046)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 3, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 5, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS) is soliciting proposals from Professional Deep Well Specialists for the urgent rehabilitation of Well No. 2 at Yosemite Valley, Yosemite National Park. This is a Total Small Business Set-Aside combined synopsis/solicitation. Proposals are due March 5, 2026.

Scope of Work

The project involves urgent repairs to Well #2, which is experiencing issues such as shaking shafts, noises, pitting, and excessive wear due to glacial silt. Key tasks include removing the motor and base, pulling the turbine pump set from approximately 187 feet deep, and assessing/refurbishing below-grade components like the T&C column pipe water lube and 1-1/2” water lube shaft assembly. Replacement of spider bearings and other bolts is expected. Bidders must also assess the well casing and PVC pipe for damage, including potential replacement in their bid. The vendor will re-install all components, adjust shaft clearance, remain onsite for startup, and disinfect the well and equipment in compliance with AWWA C654-03. Work must be completed within 5 days of notice to proceed and performed during park hours (7 am - 5 pm) at Yosemite Valley, behind Yosemite Lodge.

Contract Details

This will be a Firm Fixed-Price contract, set aside for Total Small Businesses. The applicable NAICS code is 221310 (Water, Sewage, and Other Systems) with a $41,000,000 size standard. Delivery is required within 21 days after award. The Service Contract Act Wage Determination (No. 2015-5661, Revision No. 29) for Mariposa County, California, applies, outlining minimum wage rates and fringe benefits.

Submission & Evaluation

Quotes must be submitted via email to tim_modjeski@nps.gov. Required submissions include a completed SF 18, signed acknowledgement, acknowledged amendments, completed provisions, a project narrative (maximum two pages), and three prior experience examples. Evaluation will be based on Price, Technical capability, and Prior Experience. Technical evaluation will assess equipment/personnel availability, AWWA C654-03 compliance, completion timeframe, and proposed approach. Prior experience evaluation will consider the depth/capacity of wells serviced and past performance references.

Key Dates & Site Visit

  • Proposal Due: March 5, 2026, 1400 PST.
  • Site Visit: February 26, 2026, 10:00 AM PT at Yosemite Valley Well No. 2.
  • Site Visit RSVP Deadline: End of day, February 24, 2026, to Tim Modjeski (tim_modjeski@nps.gov).

People

Points of Contact

Modjeski, TimothyPRIMARY

Files

Files

Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
J--Rehab Well no. 2 at Yosemite Valley - Yosemite NP | GovScope