J--Rehab Well no. 2 at Yosemite Valley - Yosemite NP
SOL #: 140P8526Q0023Combined Synopsis/Solicitation
Overview
Buyer
Interior
National Park Service
PWR SF/SEA MABO(85000)
SAN FRANCISCO, CA, 94104, United States
Place of Performance
Place of performance not available
NAICS
Water Supply and Irrigation Systems (221310)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Water Purification And Sewage Treatment Equipment (J046)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Feb 3, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 24, 2026, 9:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS) is soliciting proposals for the Rehabilitation of Well No. 2 at Yosemite Valley, Yosemite National Park, CA. This Combined Synopsis/Solicitation is a Total Small Business Set-Aside for urgent repairs to a deep well experiencing operational issues. Proposals are due March 24, 2026, at 2:00 PM PT.
Scope of Work
The project requires a Professional Deep Well Specialist to perform comprehensive rehabilitation of Well #2. Key tasks include:
- Removing the motor and base, and pulling the turbine pump set from approximately 187 feet depth.
- Assessing and refurbishing below-grade components, including T&C column pipe, water lube shaft assembly, spider bearings, and bolts.
- Assessing and potentially replacing the well casing (187') and PVC pipe for the level transducer sounding tube.
- Re-installing all components, adjusting shaft to optimum impeller clearance, and verifying water production, amperage, and shaft stability during startup.
- Disinfecting the well and equipment in compliance with AWWA C654-03.
- Work must be completed within 21 days after award, during park hours (7 am - 5 pm), with an NPS representative always onsite.
- The site is at approximately 4000' elevation, on an uneven, unpaved road, with a 45' vehicle length restriction on Highway 140.
Contract Details
- Contract Type: Firm Fixed-Price.
- Set-Aside: Total Small Business.
- NAICS Code: 221310 (Water Purification and Sewage Treatment Equipment Maintenance).
- Small Business Size Standard: $41,000,000.
- Wage Rates: Service Contract Act Wage Determination (No. 2015-5661, Revision No. 29) applies.
Submission & Evaluation
- Proposals Due: March 24, 2026, at 2:00 PM Pacific Time (PT).
- Submission Method: Email quotes to tim_modjeski@nps.gov.
- Required Documents: Completed SF 18, signed acknowledgement, acknowledged amendments, completed provisions, a project narrative (max two pages), and three prior experience examples.
- Evaluation Criteria: Price, Technical capability (equipment/personnel, AWWA C654-03 compliance, completion timeframe, approach), and Prior Experience (depth/capacity of wells serviced, past performance).
- Questions Due: March 4, 2026 (end of day). NPS is reviewing questions and will provide answers in a future amendment.
- Offerors must be registered in SAM.
Additional Notes
Amendment 0004 extended the RFQ due date. Previous amendments rescheduled a site visit (February 26, 2026) and clarified question deadlines.
People
Points of Contact
Modjeski, TimothyPRIMARY