Replacement of Boilers, Reheat Coils, and Cooling Tower

SOL #: 12639526Q0038Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Memphis, TN

NAICS

Plumbing (238220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 3, 2026
2
Last Updated
Feb 27, 2026
3
Submission Deadline
Mar 5, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Cotton & Tobacco Program is soliciting proposals for the Replacement of Boilers, Reheat Coils, and a Cooling Tower at its facility in Memphis, TN. This project involves the complete removal of existing mechanical equipment and the installation of new, including all associated piping, electrical, and control systems. This is a Total Small Business Set-Aside with an estimated magnitude between $250,000 and $500,000. Proposals are due March 5, 2026, at 12 p.m. CT.

Scope of Work

The contractor will be responsible for:

  • Removal and Disposal: Two steam boilers, one cooling tower, and three sets of air handler reheat coils.
  • Installation: One new steam boiler, one new cooling tower, and three new reheat coils.
  • Ancillary Work: Complete installation includes piping, valves, insulation, electrical work, temperature controls, testing, and commissioning.
  • Technical Specifications: New equipment must feature BACnet compliant microprocessor controls. Specific requirements are detailed for the steel, low-pressure boiler (80% efficiency, oil/gas combination burner), cooling tower (capacity, valve relocation), and stainless steel reheat coils.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ). Award will be made on Standard Form 1442.
  • Magnitude: Between $250,000 and $500,000.
  • Performance Period: Work to commence within 10 calendar days of Notice to Proceed, with completion required no later than July 31, 2026.
  • Set-Aside: Total Small Business.
  • Proposal Due: March 5, 2026, 12 p.m. CT.
  • Questions Due: February 27, 2026, 12 p.m. CT.
  • Site Visit: A site visit was held on February 18, 2026.

Submission & Evaluation

  • Submission Method: Email to james.g.roloff@usda.gov.
  • Submission Content: RFQ page, complete pricing breakdown, demonstration of relevant experience, and past performance information.
  • Evaluation Criteria: Award will be made on a Lowest Price, Technically Acceptable (LPTA) basis. Factors include Price, Technical Capability (relevant HVAC experience, technical approach, work sequencing, project management, quality control, and safety), and Past Performance.

Special Requirements

  • Quotes must be all-inclusive, covering equipment, materials, labor, controls, structural engineering, warranty, and all other costs.
  • Contractor must submit shop drawings, arrange for permits and fees, perform all required testing, and coordinate work with other trades and owner operations.
  • Work may need to be performed outside normal working hours.
  • Federal Construction Wage Rates for Shelby County, TN, apply and must be reviewed by bidders.
  • Amendment 1 incorporates drawings into the solicitation; bidders must review these for proposal preparation.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Replacement of Boilers, Reheat Coils, and Cooling Tower | GovScope