RH - Hot-Mix Asphalt, Tack and Prime - AVON PARK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for Hot-Mix Asphalt, Tack, and Prime Coats for the Avon Park Air Force Range, Florida. This Total Small Business Set-Aside opportunity requires the supply and delivery of approximately 8,001 tons of hot mix asphalt (HMA) and 8,072 gallons of Bituminous Tack and Prime Coats, along with associated quality control testing. Offers are due by May 12, 2026, at 05:00 PM Local Time.
Scope of Work
The contractor shall provide all plant, labor, material, design, and supervision to deliver approximately 8,001 tons of HMA Intermediate Course, Type B (with PG 67-22 or approved PG 76-22 binder) and 8,072 gallons of Bituminous Tack and Prime Coats (1,960 gallons Tack, 6,200 gallons Prime). Deliveries are for Taxiway Hotel at Avon Park Air Force Range, a Type A traffic area supporting C-17 Operations. Field and laboratory quality control testing are also required.
Key Requirements
HMA mixtures must conform to UFGS 32.12.15.13, and Tack/Prime Coats to UFGS 32.12.13. Design must adhere to Unified Facilities Criteria (UFC) and Avon Park Air Force Range Design Standards. HMA must be a minimum of 290 degrees Fahrenheit at delivery, with a maximum 30-minute interval between trucks. The contractor must produce a minimum sub-lot of 500 tons of HMA per 8-hour workday. No Recycled Asphalt Pavement (RAP) is allowed in the new mix design, though waivers may be considered. Submittals include Mix Design, QC Plan, and Material Acceptance Criteria.
Contract Details
- Contract Type: Firm Fixed Price
- Period of Performance (Delivery): June 1, 2026, to September 30, 2026. Tack and Prime Coat application period is May 2026 to October 2026.
- Place of Performance: Avon Park Air Force Range, FL (FOB Destination)
- Set-Aside: Total Small Business (NAICS 324121, Size Standard 500 employees)
- Payment: Electronic submission via Wide Area WorkFlow (WAWF). No Economic Price Adjustment (EPA) clause will be included, and demurrage fees will not be compensated for government-caused delays, except in catastrophic negligence.
Submission & Evaluation
Offers are due by May 12, 2026, at 05:00 PM Local Time. Evaluation will be based on Technical Acceptability and Price to determine the most advantageous offer. A signed copy of all amendments is required for offers to be considered. RFI questions were due by April 21, 2026.
Points of Contact
- Jon Soucy: jon.soucy@us.af.mil, 813-828-3967
- Thomas Grove: thomas.grove.1@us.af.mil, 813-828-8291