San Joaquin/Stockton DWSC FY26 Maintenance Dredging Project

SOL #: W912P726BA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SAN FRAN
SAN FRANCISCO, CA, 94102-3406, United States

Place of Performance

CA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Dredging Facilities (Y1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
May 11, 2026, 6:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), San Francisco District, solicited bids for the San Joaquin/Stockton DWSC FY26 Maintenance Dredging Project in Contra Costa, Sacramento, and San Joaquin Counties, California. This Invitation for Bid (IFB), conducted as a Full and Open Competition, sought services for maintenance dredging. The estimated cost range for this project is between $5,000,000 and $10,000,000. Bids were due on May 11, 2026, and have since been received and opened, with an abstract of offers posted.

Scope of Work

The project involves maintenance dredging of the San Joaquin/Port of Stockton River Deep Water Ship Channel (DWSC). This includes dredging to -35-ft (MLLW) plus 1 foot of paid overdepth, with the sediment trap dredged to -38.5-ft (MLLW) plus 1 foot of paid overdepth. All dredged material is suitable for Government-furnished upland sites or Contractor-furnished beneficial reuse sites.

Contract Details

This is a Single Firm-Fixed Price (FFP) contract. The Period of Performance (POP) was amended to 166 calendar days after the Notice to Proceed. Required bonds include Performance and Payment Bonds (100% of contract price) and a Bid Guarantee (20% of bid price or $3,000,000, whichever is less). Minimum insurance coverage is required for Workmen's Compensation, Employer's Liability, General Liability, and Comprehensive Automobile Liability.

Key Requirements / Deliverables

Dredging can be performed using either a clamshell or hydraulic cutterhead dredger (hydraulic must have a minimum 16-inch diameter pipeline and 1,800 horsepower). The contractor must hire a 3rd party for fish monitoring, water quality monitoring, and hydrographic survey. A Dredging Plant & Equipment Schedule and a Dredging Quality Management (DQM) system are required. Environmental controls, including dredge material placement site preparation and management, are also critical.

Submission & Evaluation

The original bid due date was May 11, 2026, at 11:30 AM PDT. Bids were required to be submitted electronically through the PIEE website. A public bid opening was held on May 11, 2026, at 01:30 PM PDT via Microsoft Teams. The solicitation received four amendments: Amendment 0001 changed the POP; Amendment 0002 updated the bid opening time and deleted a site inspection clause; Amendment 0003 added/modified several FAR clauses and a sampling report; and Amendment 0004 added FAR 52.222-90 (DEI Discrimination). Revolutionary FAR Overhaul (RFO) provisions and clauses apply. A pre-bid site visit was not provided. An Abstract of Offers has been posted, detailing bids received from Curtin Maritime Corp., The Dutra Group, and Manson Construction Co.

Eligibility / Set-Aside

This procurement was solicited as Full and Open Competition. All prospective offerors (including subcontractors) were required to be registered in SAM.gov and PIEE to view and submit offers.

Notes

The government estimate for the project was $5,449,180.97. Questions were directed to Lisa Ip (Lisa.I.Ip@usace.army.mil).

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 7Viewing
Solicitation
Posted: May 11, 2026
Version 6
Solicitation
Posted: Apr 29, 2026
View
Version 5
Solicitation
Posted: Apr 24, 2026
View
Version 4
Solicitation
Posted: Apr 21, 2026
View
Version 3
Solicitation
Posted: Apr 20, 2026
View
Version 2
Solicitation
Posted: Apr 17, 2026
View
Version 1
Solicitation
Posted: Apr 10, 2026
View
San Joaquin/Stockton DWSC FY26 Maintenance Dredging Project | GovScope