San Luis Obispo (SBP) ATCT Roof Replacement

SOL #: 00SBPSolicitation

Overview

Buyer

Transportation
Federal Aviation Administration
697DCK REGIONAL ACQUISITIONS SVCS
FORT WORTH, TX, 76177, United States

Place of Performance

San Luis Obispo, CA

NAICS

Roofing Contractors (238160)

PSC

Construction Of Air Traffic Control Towers (Y1BA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
May 14, 2026
3
Submission Deadline
May 4, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA), under the Department of Transportation, is soliciting proposals for the San Luis Obispo (SBP) ATCT Roof Replacement. This Total Small Business Set-Aside opportunity involves replacing the Air Traffic Control Tower (ATCT) cab roof at the San Luis Obispo Municipal Airport, CA. Proposals are due by May 11, 2026, at 12:00 PM EST.

Scope of Work

The subcontractor shall furnish all labor, materials, equipment, and supervision to replace the roof at the SBP ATCT. Key tasks include:

  • Removal and disposal of the existing roofing system from the ATCT cab roof (approx. 361 sq. ft.).
  • Provision and installation of a new roof hatch guardrail kit with a self-closing gate to meet code compliance.
  • Removal and replacement of all roof drains and the roof hatch.
  • Removal and relocation of the grounding counterpoise from the roof to the parapet wall.
  • Daily removal and disposal of debris generated from the work.
  • The specified material is Thermoplastic Polyolefin (TPO) roofing.
  • All work must adhere to federal, state, and local safety, security, and protection rules and regulations.

Contract Details

  • Contract Type: Solicitation (implies fixed-price construction).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238160 (Roofing Contracting), with a $19M small business size standard.
  • Period of Performance: Work to commence after Notice to Proceed (NTP) and be completed within 30 calendar days.
  • Place of Performance: San Luis Obispo Municipal Airport, 925 Airport Drive, San Luis Obispo, California 93401.
  • Acquisition System: The FAA utilizes the Acquisition Management System (AMS) in place of the FAR.

Key Dates

  • Site Visit: April 29, 2026, at 10:00 AM EST.
  • Questions Due: May 4, 2026.
  • Proposals Due: May 11, 2026, at 12:00 PM EST.

Submission & Evaluation

  • Submission: Offers must be submitted electronically via email to rodgers.l.cox@faa.gov.
  • Evaluation: Award will be based on Lowest-Priced Technically Acceptable (LPTA) source selection procedures. Proposals will be evaluated on: Offer and Other Documents, Price Proposal, Capability Statement, Construction Plan and Schedule, and Past Performance.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM).

Amendments & Notes

  • Amendment 2 (April 20, 2026): Updated the site visit, questions due, and proposal due dates.
  • Amendment 1 (April 6, 2026): Modified the Statement of Work (SOW) Section 4 (Submittals) to require a Project Health & Safety Plan, Product Safety Data Sheets, and a list of all employees on site. It also added drawing "wp-d-601-41812-t-a-6" as Attachment 5.
  • Prevailing Wages: The Davis-Bacon Act applies, requiring adherence to specified minimum wage rates and fringe benefits for San Luis Obispo County, CA.
  • Contact: Rodgers Cox (rodgers.l.cox@faa.gov).

People

Points of Contact

Rodgers CoxPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 14, 2026
View
Version 5
Solicitation
Posted: May 7, 2026
View
Version 4
Solicitation
Posted: May 1, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 20, 2026
Version 2
Solicitation
Posted: Apr 6, 2026
View
Version 1
Solicitation
Posted: Apr 2, 2026
View