San Luis Obispo (SBP) ATCT Roof Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA), under the Department of Transportation, is soliciting proposals for the San Luis Obispo (SBP) ATCT Roof Replacement. This Total Small Business Set-Aside opportunity requires contractors to furnish all labor, materials, equipment, and supervision to replace the Air Traffic Control Tower (ATCT) roof at San Luis Obispo Municipal Airport, CA. Proposals are due May 18, 2026, at 8:00 PM EST.
Scope of Work
The project involves the comprehensive replacement of the ATCT cab roof (approx. 361 sq. ft.) using Thermoplastic Polyolefin (TPO) roofing. Key tasks include:
- Removal and disposal of the existing roofing system.
- Provision and installation of a code-compliant roof hatch guardrail kit with a self-closing gate.
- Removal and replacement of all roof drains and the roof hatch.
- Relocation of the grounding counterpoise from the roof to the parapet wall.
- Daily removal and disposal of all project-generated debris. All work must adhere to federal, state, and local safety, security, and protection regulations. Detailed Cab Roof Plan and Details are provided in Attachment 5.
Contract Details & Timeline
- Contract Type: Solicitation (implies fixed-price construction). The FAA utilizes the Acquisition Management System (AMS).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 238160 (Roofing Contractors) with a $19M size standard.
- Place of Performance: San Luis Obispo Municipal Airport, 925 Airport Drive, San Luis Obispo, CA 93401.
- Period of Performance: Work to be completed within 30 calendar days after Notice to Proceed (NTP). Restricted work hours are Monday-Friday, 0700-1600, requiring coordination with air traffic.
- Site Visit: April 29, 2026, at 10:00 AM EST.
- Questions Due: May 4, 2026.
- Proposals Due: May 18, 2026, at 8:00 PM EST.
Submission & Evaluation
Proposals must be submitted electronically via email to rodgers.l.cox@faa.gov. The award will be based on a Lowest-Priced Technically Acceptable (LPTA) source selection procedure. Evaluation factors include: Offer and Other Documents, Price Proposal, Capability Statement, Construction Plan and Schedule, and Past Performance. Offerors must be registered in SAM.gov.
Special Requirements
Required submittals one week after contract award include a Project Health & Safety Plan, Product Safety Data Sheets, and a list of all on-site employees. A designated project superintendent must be on-site at all times. A minimum 5-year warranty is required for the roof system. Davis-Bacon Act prevailing wages apply.