Y--SANTA ANA NWR Design-Build/CON Shade Structure

SOL #: 140FC126Q0007Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS CONSTRUCTION & A/E - BIL/DISASTER
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Mar 2, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (FWS), under the Department of the Interior, is soliciting proposals for a Design-Build/Construction (DB/CON) Shade Structure project at the Santa Ana National Wildlife Refuge in Hidalgo County, Texas. This Total Small Business Set-Aside opportunity requires the design and construction of two new shade structures to support native habitat restoration efforts. Proposals are due March 2, 2026, by 10:00 AM local time.

Opportunity Details

This solicitation seeks a contractor to design and build two new shade structures, each approximately 7,000 square feet and 8 feet in height, featuring manually operated retractable shade panels suspended by aircraft cables. The project includes the demolition of existing shade structures and related infrastructure at the Marinoff Reveg Facility. The primary objective is to provide shading for up to 200,000 plant seedlings, crucial for the restoration of native habitat in the Rio Grande Valley.

Scope of Work

  • Demolition: Removal of existing shade structures (fabric, poles, wire) and related infrastructure.
  • Design & Construction:
    • Design and build two new shade structures, each approximately 7,000 sq ft and 8 ft high.
    • Structures must incorporate manually operated retractable shade panels suspended between aircraft cables.
    • Integration of a sprinkler system for growing and staging areas (note: this refers to an existing system, not new irrigation installation).
    • Provision of all necessary drawings, sketches, parts lists, and proposed work details for future maintenance.
  • Compliance: Adherence to International Building Code, ASCE-7, and all applicable local, state, and federal codes, including the Clean Water Act and NPDES permits.
  • Licensing: The Design-Builder (DB) must be licensed in Texas and responsible for all design, permitting, construction, and related services. Designers must hold a current Texas license.
  • Deliverables: Include a Design/Build Management Plan, 65% Design Development documents, 100% Construction Documents, Operation and Maintenance Manuals, spare parts, maintenance materials, and as-constructed drawings.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: 150 calendar days after the Notice to Proceed.
  • Wage Determination: Bidders must adhere to Wage Determination TX20260255, effective January 2, 2026, for Hidalgo County, Texas.
  • Proposal Due: March 2, 2026, by 10:00 AM local time.
  • Offer Validity: 90 calendar days from submission date.

Submission & Evaluation

  • Methodology: Lowest-Priced Technically Acceptable (LPTA). Award will be made to the responsible offeror with the lowest evaluated price that is technically acceptable and meets all solicitation requirements.
  • Proposal Format: Submissions must be in two volumes: Pricing (using the provided Line Item Pricing Bid Sheet, Attachment 3) and Technical. The Technical Volume should demonstrate understanding, a credible construction approach, relevant experience, a feasible project schedule, and compliance.
  • Requirements: A bid guarantee (20% of bid price or $3,000,000, whichever is less) is required. Contractors must maintain liability insurance covering work on the Government installation, naming both the contractor and the U.S. Government as insured; a Certificate of Insurance (COI) is required before work begins.
  • Contact: All questions and offers must be submitted in writing via email to Adam Graham (adam_graham@fws.gov).

Amendments & Clarifications

Amendment 0001 corrected a reference in Section B and added a Questions and Answers document (Attachment B09). Key clarifications include the necessity of a bid guarantee and liability insurance, confirmation that the irrigation system mentioned in the SOW is existing and not part of this project, and that no further government specifications for shade structures will be provided as it is a design-build requirement. The government will not be answering any further questions after this amendment.

People

Points of Contact

Graham, AdamPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Mar 3, 2026
View
Version 3
Solicitation
Posted: Mar 2, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 24, 2026
Version 1
Solicitation
Posted: Feb 9, 2026
View
Y--SANTA ANA NWR Design-Build/CON Shade Structure | GovScope