Y--SANTA ANA NWR Design-Build/CON Shade Structure

SOL #: 140FC126Q0007Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS CONSTRUCTION & A/E - BIL/DISASTER
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Mar 9, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (FWS), under the Department of the Interior, is soliciting proposals for a Design-Build/Construction (DB/CON) project to erect new shade structures at the Santa Ana National Wildlife Refuge (NWR) in Hidalgo County, Texas. This Total Small Business Set-Aside opportunity aims to support native habitat restoration efforts. Proposals are due by March 9, 2026, at 4:00 PM ET.

Scope of Work

This project requires the design and construction of two new shade structures, each approximately 7,000 square feet and 8 feet high, capable of shading up to 200,000 plant seedlings. The scope includes:

  • Demolition of existing shade structures and related infrastructure.
  • Construction of new structures with manually operated retractable shade panels suspended by aircraft cables.
  • Integration with an existing sprinkler system (the system itself is not part of this SOW).
  • Provision of all necessary design documentation, including drawings, sketches, parts lists, and proposed work details for future maintenance.
  • The total design and construction period shall not exceed 150 days after the Notice to Proceed.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Response Due: March 9, 2026, 4:00 PM ET.
  • Published Date: March 2, 2026.
  • Evaluation: Lowest-Priced Technically Acceptable (LPTA). Award will be made to the responsible offeror with the lowest evaluated price that is technically acceptable and meets all solicitation requirements.
  • Wage Determination: TX20260255, dated January 2, 2026, applies to this project.

Key Requirements & Clarifications

The Design-Builder (DB) must be licensed in Texas and responsible for all design, permitting, construction, and related services. Adherence to all applicable local, state, and federal codes, including International Building Code (IBC) and ASCE-7, is mandatory. Recent amendments and Q&A clarify:

  • Insurance: FAR 52.228-5 and DIAR 1452.228-70 requirements apply; a Certificate of Insurance (COI) is needed before work begins.
  • Bid Guarantee: A bid guarantee is required regardless of the billing method.
  • Technical Feasibility: Vendors are responsible for determining if their proposed solution meets requirements; the Government will not provide pre-evaluation feedback.
  • No further questions will be answered after the issuance of Amendment 0002.

Submission Details

Proposals must be submitted in two volumes: Pricing and Technical. The Technical Volume should demonstrate understanding of requirements, a credible construction approach, relevant experience, a feasible project schedule, and compliance. A specific pricing sheet (B08_Solicitation_Attachment_3) must be used. All questions and offer submissions must be in writing via email to the primary contact.

Contact: Adam Graham (adam_graham@fws.gov, 7623250609).

People

Points of Contact

Graham, AdamPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Mar 3, 2026
View
Version 3Viewing
Solicitation
Posted: Mar 2, 2026
Version 2
Solicitation
Posted: Feb 24, 2026
View
Version 1
Solicitation
Posted: Feb 9, 2026
View
Y--SANTA ANA NWR Design-Build/CON Shade Structure | GovScope