SOLICITATION: PREPARE, REMOVE PAINT (LEAD ABATEMENT), AND REPAINT THE EXISTING ASDE TOWER AND SHELTERS AT THE DENVER INTERNATIONAL AIRPORT (DEN) IN DENVER, CO
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA) is soliciting proposals for the preparation, lead abatement, paint removal, and repainting of the Airport Surface Detection Equipment (ASDE) tower and shelters at the Denver International Airport (DEN) in Denver, CO. This is a 100% Small Business Set-Aside for a Firm Fixed-Price (FFP) contract. Proposals are due by March 6, 2026.
Scope of Work
The contractor will provide all labor, materials, and equipment to:
- Perform lead abatement and paint removal on the existing ASDE tower frame and associated shelters.
- Repaint the tower according to FAA obstruction marking standards (Aviation Orange and White) and shelters (White) using Sherwin Williams Polysiloxane XLE-80 or equivalent.
- Manage hazardous materials, including lead-containing materials (LCM) and bird feces, in compliance with OSHA and EPA regulations.
- Complete all work within 45 days after the Notice to Proceed.
Contract & Timeline
- Type: Firm Fixed-Price (FFP)
- Estimated Value: $350,000 – $450,000
- Set-Aside: 100% Small Business
- Site Visit: February 25, 2026, at 10:00 AM local time (RSVP by Feb 24).
- Questions Due: February 27, 2026.
- Proposals Due: March 6, 2026, at 4:00 PM CT.
Evaluation Factors
Award will be made to the lowest priced quote that is determined to be fully responsive and responsible. Key submission requirements include:
- QP-2 Certification: The contractor or subcontractor must be a current SSPC QP-2 certified holder.
- Organizational Experience: Documentation of at least two projects involving tower refurbishment/painting valued at over $100,000 completed within the last five years.
- Financial Security: A 20% Bid Bond (SF-24) is required with the proposal; 100% Performance and Payment bonds are required upon award.
Additional Notes
The site has no available restroom, water, or electrical facilities; the contractor must provide these. Real ID or a passport is required for site access.