SOLICITATION: PREPARE, REMOVE PAINT (LEAD ABATEMENT), AND REPAINT THE EXISTING ASDE TOWER AND SHELTERS AT THE DENVER INTERNATIONAL AIRPORT (DEN) IN DENVER, CO
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA) is soliciting proposals for the preparation, lead abatement, paint removal, and repainting of the existing ASDE Tower and shelters at the Denver International Airport (DEN) in Denver, CO. This is a Total Small Business Set-Aside for a Firm Fixed Price (FFP) contract. Proposals are due March 13, 2026.
Scope of Work
The requirement involves comprehensive services for the ASDE Tower and shelters, including:
- Preparation, removal of existing paint (including lead abatement), and repainting.
- Application of Sherwin Williams Polysiloxane XLE-80 or equivalent, to a 12 mil final thickness.
- Tower colors: FAA AC 70/7460-1M standards (#17875 white and #12197 aviation orange); Shelters color: White.
- Addressing potential hazards from bird feces and lead-containing materials (LCM).
- Compliance with all federal, state, and local regulations for Lead-Based Paint (LBP) removal, storage, transportation, and disposal.
- Use of a man lift is required; climbing/painting may require a certified Competent Tower Rescue Climber.
- Work must be completed within 45 days after receipt of the Notice to Proceed.
Contract Details
- Contract Type: Firm Fixed Price (FFP)
- Set-Aside: Total Small Business (FAR 19.5)
- Estimated Value: $350,000 - $450,000
- Period of Performance: 45 days after Notice to Proceed
- Place of Performance: Denver International Airport, Denver, CO
Key Requirements & Submission
Offerors must provide:
- Completed SIR document: With pricing in Section B and representations/certifications in Section K.
- Organizational Experience Questionnaire (OEQ): Demonstrating two projects involving Communication Tower Refurbishment or Tower Painting (communication or water tower), valued at over $100,000, completed or underway within the last five years.
- QP-2 Certificate: Proof of current certification as a QP-2 Contractor recognized by the Society for Protective Coatings (SSPC).
- Bid Bond (SF-24): Fully executed. A proposal guarantee of 20% of the total proposal amount is required.
- Performance and Payment Bonds: 100% of the contract price and total cost, respectively, are required upon award.
- Site Visit: An optional site visit is scheduled for February 25, 2026, at 10:00 AM local time. Attendees must contact Nathan Vaughan by February 24, 2026, and bring Real ID.
- Questions Due: All questions must be submitted via email to Stephen.N.Branch@faa.gov by February 27, 2026.
- Proposal Due: March 13, 2026, by 4:00 PM Central Time, via email to Stephen.n.branch@faa.gov.
Evaluation & Award
The FAA intends to award a contract to the lowest priced offeror determined to be fully responsive and responsible. Evaluation factors and basis for award are detailed in Section M of the solicitation.
Additional Notes
Documents include a Lead-Containing Materials Paint Chip Analysis report, indicating the presence of lead and requiring lead-safe work practices. An inspection report notes poor paint condition and other tower issues. Wage determinations for Denver County, CO, are applicable.