USS GRIDLEY (DDG 101) FY27 Depot Modernization Period (DMP)

SOL #: N0002426R4414Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSEA HQ
WASHINGTON NAVY YARD, DC, 20376-5000, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
Jul 3, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Naval Sea Systems Command (NAVSEA) has issued Solicitation N00024-26-R-4414 for the FY27 Depot Modernization Period (DMP) of the USS GRIDLEY (DDG 101). This opportunity involves a combination of maintenance, modernization, and repair, requiring a highly capable contractor with substantial facilities on the West Coast. An amendment (0001) updates the Statement of Work (SOW) to include Attachment J-12, which supersedes S-10. Proposals are due by July 3, 2026.

Scope of Work

This availability encompasses extensive maintenance, modernization, and repair efforts for the USS GRIDLEY (DDG 101). Key modernization efforts include SLQ-32(V)7, Mk 6 Mod X, TTWCS V5.6.2.X, AWS TI-16, VLS Magazine Ventilation Upgrades, AN/SQQ-89A(V)15, replacement of LOP with LOFP, AC Chlorinator upgrade, magazine fire detection system, various NAVSEA Program Alts, berthing modifications, and removal of Unused MCS Cables.

Extensive maintenance requirements cover:

  • Hull Structure: Preservation and repairs to bilges, weather decks, intake/uptake, underwater hull, and decks.
  • Propulsion Plant: Repair and preservation of combustion air intakes, exhaust air uptakes, and various valves, motors, and pumps.
  • Electric Plant: GTG repairs, cableway inspection, generator support system repairs, and MCT/MCP testing.
  • Command and Surveillance: Tank level indicator repairs, IFF antennae repair, array resurfacing, sonar transducer replacement, SLQ-32 and PCMS repair, and MK 82 Director replacement.
  • Auxiliary Systems: Insulation/lagging repair, ventilation fan overhaul, A/C plant compressor overhaul, piping system cleaning, HPAC overhaul, anchor windlass repair, and refrigeration plant overhaul.
  • Outfit and Furnishings: Interior/exterior preservation, stack repair, hull preservation, and replacement of deck covering and non-skid.
  • Armament: Removal, shipping, and replacement of MT 51 gun, CIWS, and RSLs.
  • Support Services: Hazardous waste control and temporary air conditioning/lodging.

The prime contractor must provide an integrated production schedule incorporating AIT, 3rd Party contractors, and Government workload. Rough estimates indicate approximately 139,047 man-days for maintenance and 68,024 man-days for modernization.

Contract & Timeline

  • Type: Solicitation (N00024-26-R-4414)
  • Set-Aside: None (Not set-aside for small business due to complexity and magnitude, per FAR 19.502-2(b)).
  • Response Due: July 3, 2026, 7:00 PM UTC
  • Published Date: May 19, 2026
  • Anticipated Award: October 2026
  • Performance Period: March 2027 to November 2028

Key Requirements

The contractor must possess substantial facilities, including a pier greater than 509 ft, and a dry dock capable of supporting a DDG51 Class Ship (Length 510 ft, Beam 66.5 ft, Draft 21.9 ft, Displacement 9191 tons), along with specific electrical, potable water, sea water, sewage, and compressed air capabilities. The availability is solicited on a coast-wide basis on the West Coast.

Response Instructions

Interested offerors must monitor PIEE and SAM.gov for the solicitation and any amendments. Registration in SAM (www.sam.gov) is mandatory. To request access to attachments (including J-12 and J-2), provide a written request with your company's SAM Unique Entity Identifier (UEI) to:

People

Points of Contact

Files

Files

View
View
View
View
Download

Versions

Version 4Viewing
Solicitation
Posted: May 19, 2026
Version 3
Solicitation
Posted: May 5, 2026
View
Version 2
Pre-Solicitation
Posted: Apr 20, 2026
View
Version 1
Special Notice
Posted: Apr 14, 2026
View
USS GRIDLEY (DDG 101) FY27 Depot Modernization Period (DMP) | GovScope