Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, USACE Memphis District, is soliciting proposals for Stringout Construction (Rehabilitation) at the Ensley Engineer Yard (EEY). This project involves significant infrastructure upgrades and replacements, with an estimated magnitude between $25,000,000 and $100,000,000. The acquisition is an unrestricted procurement with a HUBZone Price Evaluation Preference. Proposals are due March 19, 2026.
Scope of Work
The work encompasses furnishing all labor, materials, tools, and equipment for the Stringout Replacement at EEY, including incidental related work. The project is divided into a base project and six (6) options. Key tasks include:
- Removal of existing steel ramp, abutment, timber, steel pipe, and concrete piles.
- Demolition and removal of concrete piles and pile caps from the existing railroad trestle.
- Excavation, dredging, and disposal of materials.
- Installation of Government Furnished Equipment (GFE) steel floats and a new landing barge.
- Providing new steel pipe piles, steel-framed pile clusters, and donut fenders.
- Installation of new utilities, including electrical power, lighting, lightning protection, potable water, fire water, telecommunications, and compressed air.
- Construction of a new steel connector bridge, an electrical substation with equipment foundation, and an abutment/landside approach to the connector bridge.
- All associated earthwork activities.
The base project will be completed sequentially in Phase 1 then Phase 2 to ensure continuous operation of the Ensley Engineer Yard. Options, if awarded, will be completed as directed by the Government.
Contract & Timeline
- Type: Solicitation (Unrestricted Procurement)
- Magnitude: Between $25,000,000 and $100,000,000
- Set-Aside/Preference: Unrestricted with HUBZone Price Evaluation Preference
- Proposal Due: March 19, 2026, 3:00 PM Z
- Published: January 31, 2026
Evaluation
Award will be made using a Best Value Tradeoff source selection process. A Project Labor Agreement (PLA) will be required for this contract.
Additional Notes
This solicitation includes links to the PIEE Solicitation Module for further details, web-based training, and registration instructions.