Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through the USACE Memphis District (W07V ENDIST MEMPHIS), has issued a solicitation for Stringout Construction (Rehabilitation) at the Ensley Engineer Yard (EEY). This project involves significant marine and landside construction and rehabilitation work. The acquisition is an unrestricted procurement with a HUBZone Price Evaluation Preference, utilizing a Best Value Tradeoff source selection process. A Project Labor Agreement (PLA) will be required. The estimated magnitude of construction is between $25,000,000 and $100,000,000. Proposals are due by March 19, 2026, at 3:00 PM Z.
Scope of Work
The work consists of furnishing all labor, materials, tools, and equipment for the Stringout Replacement at EEY, including incidental related work. The project is divided into a base project and six (6) options. Key tasks include:
- Removal of existing steel ramp, abutment, timber piles, steel pipe piles, and concrete piles.
- Demolition and removal of concrete piles and pile caps from the existing railroad trestle.
- Excavation, dredging, and disposal of materials.
- Installation of Government Furnished Equipment (GFE) steel floats and a new landing barge.
- Providing new steel pipe piles and steel-framed pile clusters.
- Providing donut fenders.
- Installation of new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air).
- Construction of a new steel connector bridge, an electrical substation (including equipment foundation), and an abutment/landside approach to the connector bridge.
- All earthwork activities for the connector bridge.
The base project work must be completed sequentially from Phase 1 to Phase 2 to allow continued operation of the Ensley Engineer Yard. Phase 1 must be completed before Phase 2 begins. Options, if awarded, will be completed in the sequence directed by the Government.
Contract & Timeline
- Contract Type: Solicitation (Unrestricted Procurement)
- Product/Service Code: Y1PZ (Construction Of Other Non Building Facilities)
- Magnitude: $25,000,000 to $100,000,000
- Set-Aside: Unrestricted with HUBZone Price Evaluation Preference
- Proposal Due: March 19, 2026, 3:00 PM Z
- Published Date: February 27, 2026
Evaluation
Award will be based on a Best Value Tradeoff source selection process. A Project Labor Agreement (PLA) is a mandatory requirement for this acquisition.
Additional Notes
This solicitation is managed by the Department of the Army, USACE Memphis District. Interested parties should refer to the provided PIEE Solicitation Module links for further details and submission instructions. Primary contact is Jessica Lurry (Jessica.M.Lurry@usace.army.mil, 901-579-2055).