Sutton Boat Launch Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service, specifically the CSA Northwest 6 office, is seeking quotes for the Sutton Boat Launch Replacement project at the Sutton Lake Day-Use Site in Waldport, OR. This is a Total Small Business Set-Aside for the installation of a new boat ramp to replace the existing structure. Quotes are due by April 23, 2026.
Scope of Work
This opportunity involves the installation of a new boat ramp at the Sutton Lake Day-Use Site. Amendment 1 clarifies requirements for dive operations, authorizing an alternative method for in-water work that does not require certified divers. If an alternative method is used, a formal Dive Plan is not required, but contractors must still identify safety measures and risk mitigation procedures.
Contract & Timeline
- Type: Combined Synopsis/Solicitation (Request for Quote - RFQ)
- Solicitation Number: 1240BH26Q0004
- Set-Aside: Total Small Business
- NAICS Code: 237310 – Highway, Street, and Bridge Construction
- Small Business Size Standard: $45.0 million
- PSC Code: Y1PA – Construction Of Recreation Facilities (Non Building)
- Period of Performance: June 1, 2026, to October 1, 2026 (updated by Amendment 1)
- Quotes Due: April 23, 2026, by 1630 PST
- Published: April 17, 2026
Submission Instructions
Offerors must submit a complete quote package, including all required documentation, to susie.felton@usda.gov. Quotes must be received no later than COB (1630) PST on April 23, 2026. All solicitation documents are located in PDF Portfolios A and B, which must be opened using the desktop version of Adobe Acrobat for full visibility. Incomplete or non-responsive quotes may be deemed non-responsive.
Amendment Details
Amendment 1 updates the solicitation, specifically affecting Attachments 2–4. Key changes include:
- Clarification on dive operations, allowing alternative in-water work methods without requiring certified divers or a formal Dive Plan, provided safety measures are identified.
- The period of performance is updated to 06/01/2026 to 10/01/2026.
- Contractors proposing an alternative to dive operations should enter $0.00 for CLIN 0015 – Dive Team. Offerors must review and acknowledge Amendment 1.