SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)

SOL #: W51EW7-26-R-A002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC TSC
FORT SAM HOUSTON, TX, 78234-0000, United States

Place of Performance

Aberdeen Proving Ground, MD

NAICS

Industrial Building Construction (236210)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 18, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 24, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army's Mission and Installation Contracting Command (MICC) is soliciting proposals for a National Capital Region (NCR) Multiple Award Task Order Contract (MATOC). This Total Small Business Set-Aside aims to procure facility sustainment, restoration, and modernization (SRM), including renovation, repairs, and minor construction services for seven Army installations within or near the NCR. The contract has a potential value of over $1 billion. Proposals are due April 24, 2026, at 2:00 PM CT.

Scope of Work

This MATOC will provide comprehensive SRM services, minor construction, small renovations, modernization, demolition, and restoration. Work will be performed in accordance with individual Task Orders (TOs) issued by the installations' Directorate of Public Works (DPW). Services encompass various engineering areas, including electrical, environmental, mechanical, and structural. Projects may include barracks, administrative facilities, maintenance shops, child development centers, physical fitness centers, food service facilities, ranges, training facilities, museums, airfield structures, roads, public safety facilities, athletic fields, underground utilities, overhead utilities, gates, cemeteries, warehouses, auditoriums, and research, development, and testing facilities. A "Seed Project" is included as part of the initial evaluation.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP) Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC).
  • Number of Awards: Up to thirteen (13) MATOC holders are anticipated.
  • Period of Performance: A five (5) year ordering period (July 30, 2026 - July 29, 2031), with two (2) one-year option periods, totaling seven (7) years.
  • Minimum Guarantee: $5,000.00 per MATOC contract for the 5-year ordering period.
  • Maximum Ceiling: $1,050,778,375.
  • NAICS Code: 236210, Industrial Building Construction, with a size standard of $45,000,000.00.

Set-Aside

This is a Total Small Business Set-Aside (SBSA). Offerors must be certified small businesses at the time of proposal submission, award, and throughout the contract life.

Evaluation Criteria

Proposals will be evaluated using Best Value Lowest Price Technically Acceptable (LPTA) source selection procedures, based on three factors:

  1. Technical Capability Approach: Assesses management and staffing (key personnel qualifications), the Seed Project (technical capability, bonding, staffing, schedule), and MATOC Program Management (organization, concurrent TO management, resource allocation, quality management).
  2. Past Performance: Evaluates recent and relevant performance as a prime contractor or affiliate. Past Performance Questionnaires (PPQs) are required; CPARS are not accepted in lieu. A "neutral" rating is considered "Acceptable."
  3. Cost/Price: Evaluated for completeness, balanced pricing, and reasonableness. Only the Seed Project pricing will be evaluated for the MATOC award. A rating of "Acceptable" is required for both Technical Capability Approach and Past Performance to be considered for award. The Government may award without discussions.

Submission Requirements & Key Dates

  • Proposal Submission Deadline: April 24, 2026, at 2:00 PM CT.
  • Submission Method: SOLELY through the PIEE Solicitation Module (https://piee.eb.mil/).
  • Proposal Validity: Proposals must be valid for 180 days from the RFP close date.
  • Page Limits: Volume I (Technical Capability Approach) is limited to 75 pages; Volume II (Past Performance) is limited to 35 pages. Volume III (Cost/Price) has no page limitation.
  • Required Attachments: Offerors must submit Attachment 0002 (Rate Price Sheet NTE), Attachment 0003 (Past Performance Questionnaire), and Attachment 0006 (Contractor Bid Sheet).
  • Amendment Acknowledgment: Offerors must acknowledge Amendment 0001 within their proposal.
  • Questions Deadline: The deadline for submitting questions has passed (April 3, 2026).

Additional Notes

This solicitation, W51EW7-26-R-A002, has been amended by Amendment 0001, which revised sections L and M and incorporated updated attachments. All other terms and conditions remain in full effect.

People

Points of Contact

Danette WilsonPRIMARY
Amy HahkaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Apr 20, 2026
View
Version 6Viewing
Solicitation
Posted: Mar 14, 2026
Version 5
Solicitation
Posted: Mar 13, 2026
View
Version 4
Special Notice
Posted: Feb 18, 2026
View
Version 3
Pre-Solicitation
Posted: Feb 18, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 18, 2026
View
Version 1
Special Notice
Posted: Feb 18, 2026
View