Y--SARA 257238 Tour Stop 7 Drainage Repair

SOL #: 140P2026R0028Award Notice

Overview

Buyer

Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 2, 2026
2
Last Updated
Mar 13, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), through its DSC Contracting Services Division, is soliciting proposals for a Design Bid-Build contract to repair a significant drainage issue at Tour Stop 7, Saratoga National Park. This opportunity is a 100% Small Business Set-Aside. Proposals are due by February 17, 2026, at 11:00 AM Eastern Standard Time (EST).

Scope of Work

The project, titled "Y--SARA 257238 Tour Stop 7 Drainage Repair," aims to address groundwater seep drainage problems at Tour Stop 07 (TS 07). The work primarily involves:

  • Drainage System Installation: Grading, installation of a comprehensive drainage system (swale, stone drainage layer, geotextile, underdrain, stormwater piping, drain basins, soil layer, stone cobble, flared end sections).
  • Site Restoration: Fine grading, installation of erosion blankets, and seeding to restore the landscape.
  • Pavement Work: Saw cutting, asphalt removal, milling, and full-depth asphalt replacement/overlay.
  • Archeological Monitoring: Mandatory archeological monitoring services during all ground-disturbing activities, including background research, artifact cataloging/curation, and report preparation, for up to fourteen (14) eight-hour days of fieldwork.

Detailed construction drawings and specifications are provided in Attachments 1 and 2.

Contract Details

  • Contract Type: Firm Fixed-Price, single prime contract.
  • Set-Aside: 100% Small Business Set-Aside (FAR 19.5).
  • Period of Performance: Sixty (60) days after the Notice to Proceed.
  • Bonds: Payment and performance bonds are required; no bid guarantee is necessary.
  • Location: Tour Stop 7, Saratoga National Historical Park, Saratoga County, Stillwater, New York.
  • Wage Rates: Subject to the U.S. Department of Labor's prevailing wage rates and fringe benefits for construction trades in New York State (General Decision Number dated 1/2/2026).
  • Work Hours: Generally limited to 7:00 a.m. to 5:00 p.m., Monday-Friday.

Submission & Evaluation

  • Proposal Deadline: February 17, 2026, by 11:00 AM EST.
  • Submission Method: Proposals must be submitted via email to the Contract Specialist and Contracting Officer.
  • Evaluation Criteria: Award will be based on a Best Value Continuum Tradeoff Process, considering technical approach, schedule, past performance, and price.
  • Proposal Format: Offerors must submit proposals in two volumes: Volume I (Technical Proposal) and Volume II (Business and Price Proposal).
  • Pricing: Detailed pricing for Contract Line Item Numbers (CLINs) 1 ("Drainage, Grading and Associated Work") and 2 ("Archeological Monitoring and Reporting") is required using the provided Price Schedule Template.
  • Site Visit: A virtual site visit was held on February 5, 2026. Questions and Answers from this visit are available via Amendment 0002.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM).

Contact Information

For questions, contact Linda Melnick at linda_melnick@nps.gov or Charles Thompson.

People

Points of Contact

Melnick, LindaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Award Notice
Posted: Mar 13, 2026
Version 3
Solicitation
Posted: Feb 13, 2026
View
Version 2
Solicitation
Posted: Feb 13, 2026
View
Version 1
Solicitation
Posted: Feb 2, 2026
View