TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117

SOL #: FA813726R0030Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 17, 2026
3
Submission Deadline
Jun 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the Renovation of Restrooms in Building 117 (B117) at Tinker Air Force Base, Oklahoma. This Firm Fixed-Price contract is a Total Small Business Set-Aside and is restricted to current MAC BOA holders who attended the mandatory site visit on May 14, 2026. The project involves comprehensive demolition and replacement of plumbing fixtures, domestic piping, and sanitary sewer systems. Proposals are due by June 29, 2026, at 2:00 PM local time.

Scope of Work

This Design-Bid-Build project entails the complete renovation of men's and women's restrooms in B117. The scope includes:

  • Demolition and Replacement: All existing plumbing fixtures, domestic piping to isolation valves, and sanitary sewer systems.
  • Architectural & Engineering: Detailed plans cover architectural, structural, plumbing, fire protection, mechanical, and electrical systems, including a recent revision for a door swing change.
  • Occupied Facility: The facility will remain occupied during construction, requiring the contractor to provide portable bathrooms and showers.
  • Phased Construction: The men's restroom must be completed before the women's restroom.
  • Key Personnel: Contractor must provide a Project Manager, Quality Control Manager, and Site Safety and Health Officer with specified qualifications.
  • Deliverables: Baseline construction schedule, progress reports, working documents (reflected ceiling, utility, plumbing, lighting plans), and record drawings.
  • Special Considerations: Mandatory Foreign Object Debris (FOD) training, affirmative procurement for EPA/USDA/Energy Star items, and management of identified lead concerns in wall tile glaze.

Contract Details

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to Tinker AFB MAC BOA holders who attended the mandatory site visit on May 14, 2026.
  • Period of Performance: Work must begin within 10 calendar days after award and be completed within 625 calendar days.
  • Estimated Value: Not explicitly stated; NAICS size standard is $45,000,000.00 annual receipts.
  • Place of Performance: Building 117, Tinker Air Force Base, Oklahoma.

Submission & Evaluation

  • Proposal Due Date: June 29, 2026, at 2:00 PM local time.
  • Evaluation Method: Lowest Priced Technically Acceptable (LPTA) Source Selection.
  • Technical Factors: Proposals will be rated "Acceptable" or "Unacceptable" based on Capability and Management, and Schedule and Planning. All subfactors must be "Acceptable." No technical tradeoffs or credit for exceeding requirements.
  • Price Evaluation: Reasonableness, balanced pricing, and realism.
  • Submission Requirements: Electronic proposals in specified formats (MS Word, Excel, PowerPoint, MS-Project, Adobe PDF - text-searchable). Must include completed OPR, amendments, cover letter, work plan, price, and a bid bond (minimum 20%). Annual representations and certifications via SAM.gov are required.
  • Base Access: Personnel requiring base access must be listed on an Entry Access List (EAL) form, including SSN and DOB. AFMC Form 387 identification badges are required.

Key Documents

  • Solicitation FA813726R0030: Outlines overall requirements, terms, and conditions.
  • Statement of Work (SOW): Details project objectives, scope, key personnel, and performance standards.
  • Drawings (WWYK20190023_REV02_19MAY2026.pdf): Comprehensive architectural, structural, and MEP plans.
  • Section L - Instructions to Offerors: Provides detailed guidance for proposal preparation.
  • Section M - Evaluation Factors for Award: Explains the LPTA evaluation criteria.
  • Wage Determination (OK20260049): Specifies prevailing wage rates for labor.
  • Submittal Register: Lists all required project submittals.

Contact Information

People

Points of Contact

Eric OwensPRIMARY
Stephen PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jun 17, 2026
View
Version 7
Solicitation
Posted: Jun 8, 2026
View
Version 6
Solicitation
Posted: Jun 8, 2026
View
Version 5
Solicitation
Posted: Jun 2, 2026
View
Version 4
Solicitation
Posted: May 28, 2026
View
Version 3
Solicitation
Posted: May 22, 2026
View
Version 2Viewing
Solicitation
Posted: May 21, 2026
Version 1
Solicitation
Posted: May 6, 2026
View