TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117

SOL #: FA813726R0030Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 17, 2026
3
Submission Deadline
Jun 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the Renovation of Restrooms in Building 117 (B117) at Tinker Air Force Base, Oklahoma, under Solicitation Number FA813726R0030. This opportunity is a Total Small Business Set-Aside and is restricted to MAC BOA Holders ONLY who attended the mandatory site visit on May 14, 2026. Proposals are due by June 29, 2026.

Scope of Work

This Design-Bid-Build contract involves the complete demolition and replacement of existing plumbing fixtures, domestic piping, and sanitary sewer in both men's and women's restrooms at B117. The facility will remain occupied during construction, requiring the contractor to provide portable bathrooms and showers. Construction will be phased, with the men's restroom completed before the women's. The project requires adherence to detailed architectural, structural, plumbing, fire protection, mechanical, and electrical plans.

Eligibility & Key Requirements

This solicitation is exclusively for Tinker AFB MAC BOA Holders who participated in the mandatory site visit on May 14, 2026. Key personnel, including a Project Manager, Quality Control Manager, and Site Safety and Health Officer, are required. Contractors must comply with Tinker AFB's General Requirements, covering safety, environmental protection, airfield operations (if applicable), quality control, and submittal procedures. Specific requirements include FOD awareness training, lead paint management, and adherence to prevailing wage determinations.

Contract Details & Timeline

This is a Firm Fixed Price contract. Performance must begin within 10 calendar days after award and be completed within 625 calendar days. Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) source selection process, focusing on technical acceptability in Capability & Management, and Schedule & Planning. A bid guarantee is required.

Submission Instructions

Proposals are due by 2:00 PM local time on June 29, 2026. Submissions must be electronic, in formats readable by MS Word, Excel, PowerPoint, MS-Project, or text-searchable Adobe Acrobat (PDF). All pages must include the "CUI SOURCE SELECTION INFORMATION" legend. Offerors must provide a statement of completed annual representations and certifications via SAM.gov.

Key Documents

The solicitation package includes a Statement of Work (SOW), detailed drawings (WWYK20190023_REV02_19MAY2026.pdf, Att12_190023_Drawings_Final.pdf), Instructions to Offerors (Section L), Evaluation Factors for Award (Section M), a Submittal Register, Wage Determination, and various Tinker AFB General Requirements specifications (e.g., safety, environmental, submittal procedures, quality control).

People

Points of Contact

Eric OwensPRIMARY
Stephen PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jun 17, 2026
View
Version 7
Solicitation
Posted: Jun 8, 2026
View
Version 6
Solicitation
Posted: Jun 8, 2026
View
Version 5
Solicitation
Posted: Jun 2, 2026
View
Version 4Viewing
Solicitation
Posted: May 28, 2026
Version 3
Solicitation
Posted: May 22, 2026
View
Version 2
Solicitation
Posted: May 21, 2026
View
Version 1
Solicitation
Posted: May 6, 2026
View