TINKER AFB MAC BOA WWYK260003 REPAIR ROOF, ELECT, HVAC & RESTROOMS B#4019
SOL #: FA813726R0028Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States
Place of Performance
S Coffeyville, OK
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Office Buildings (Z2AA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 1, 2026
2
Last Updated
Jun 16, 2026
3
Submission Deadline
Jun 24, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the renovation of Building B4019 at Tinker Air Force Base, Oklahoma. This project, titled "REPAIR ROOF, ELECT, HVAC & RESTROOMS," involves comprehensive upgrades to modernize the facility for office use. This opportunity is a Total Small Business Set-Aside and is restricted to Tinker AFB MAC BOA Holders who attended the mandatory site visit. Offers are due by June 24, 2026.
Scope of Work
The project requires furnishing all design/engineering services, materials, labor, and equipment for the renovation of Building B4019. Key aspects include:
- Civil/Site Improvements: Constructing ADA-compliant sidewalks, drainage improvements, parking lot restriping, and regrading.
- Architectural: Renovating the building for new office occupancy, including HVAC ductwork, electrical, fire alarm systems, infilling doors, adding new windows, roof patching, insulation, and restroom upgrades.
- Structural: Infilling overhead doors and adding new windows with associated steel work.
- Mechanical: Complete removal and replacement of existing HVAC, DDC, and exhaust systems, ensuring positive/negative pressure as required.
- Electrical: New connections for HVAC, replacement of exit signs/emergency lighting, new GFCI receptacles, and cable trays.
- Fire Protection/Life Safety: Installation of a new integrated fire alarm and mass notification system, with the existing sprinkler system remaining operational.
- Communications: Installation of wall-mounted devices via CIPS work orders. The contractor is fully responsible for all design, engineering, site investigations, and ensuring the final product meets all applicable codes and functional requirements.
Contract & Timeline
- Contract Type: Firm Fixed Price
- Estimated Magnitude: Between $1,000,000 and $5,000,000
- Period of Performance: Begin within 10 calendar days and complete within 265 calendar days after Notice to Proceed.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 236220 (Commercial and Institutional Building Construction), Size Standard $45,000,000
- Offer Due Date: June 24, 2026, 02:00 PM CDT
- Published Date: June 17, 2026 (latest amendment)
Eligibility & Evaluation
- Eligibility: This solicitation is exclusively for Tinker AFB MAC BOA Holders ONLY who attended the mandatory site visit on May 20, 2026.
- Evaluation: Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) source selection procedure. Offers must be valid for at least 120 calendar days.
Key Requirements & Notes
- Mandatory Site Visit: Attendance at the May 20, 2026 site visit was mandatory for eligibility.
- Design Responsibility: Contractor is fully responsible for design, engineering, and field verification; government-provided drawings are for reference.
- Record Drawings: Final as-built/record drawings must be submitted in native, editable AutoCAD (.dwg) format, adhering to Tri-Services A/E/C CADD Standard Release 6.0.
- Bonds: Performance and Payment Bonds are required.
- Key Personnel: Resumes for a Project Manager, Design Project Manager (licensed in OK), Quality Control Manager, Site Safety and Health Officer, and Project Superintendent are required within 5 days of NTP.
- Hazardous Materials: No asbestos or lead-based paint is present in the existing roof, insulation, ductwork, or restroom finishes.
- New Clauses: Includes 52.223-23, 52.240-93, 252.204-7012, and 252.240-7997.
People
Points of Contact
Mario TedeschiPRIMARY
Tamra TorresSECONDARY
Files
Versions
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Jun 16, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Jun 16, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Jun 12, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 1, 2026