UPS System Maintenance

SOL #: 1232SA26Q0411Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Manhattan, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 20, 2026, 11:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) is soliciting proposals for Uninterruptible Power Supply (UPS) System Maintenance at the National Bio and Agro-Defense Facility (NBAF) in Manhattan, KS. This 100% Small Business Set-Aside opportunity seeks comprehensive preventative maintenance and repair services for Rectifier/Charger, Battery, and UPS Systems. Proposals are due May 20, 2026.

Scope of Work

The contractor will provide all-inclusive maintenance and repair services for NBAF's Rectifier/Charger, Battery, and UPS Systems, as detailed in the latest Performance Work Statement (PWSv3) and RFI clarifications. This includes:

  • Preventative Maintenance: Semi-annual and annual inspections, cleaning, calibration, and essential software/firmware updates. Battery services adhere to IEEE 1188 standards, including voltage/current measurements, temperature checks, and load testing.
  • Service Calls & Repairs: Emergency response requires phone contact within 2 hours and on-site presence within 6 hours. Non-emergency repairs require a timeline within 3 calendar days. Repairs exceeding 32 labor hours per instance are outside the scope.
  • Parts & Materials: Reimbursement for pre-approved parts and materials. Optional Contract Line Item Numbers (CLINs) are available for specific UPS battery and capacitor replacements.
  • System Operations: Contractor is responsible for safely shutting down UPS systems, bypassing loads, and disconnecting power sources as needed.

Performance Standards

Key performance metrics include:

  • Quality: 98% conformity to manufacturer specifications and PWS requirements.
  • Response Time: 100% compliance for emergency (2-hour phone, 6-hour on-site) and non-emergency (3-day timeline) responses.
  • Documentation: 100% daily service reports within one business day, accurate logs and billing.
  • Security & Safety: 100% compliance with site regulations.

Contract & Timeline

  • Contract Type: Firm-Fixed Price Requirements Contract.
  • Period of Performance: One (1) base year and four (4) one-year option periods, totaling five years.
  • Set-Aside: 100% Small Business.
  • NAICS: 238210, Size Standard: $19 Million.
  • Proposal Due Date: May 20, 2026, 11:30 AM UTC.
  • Contact: David Reynolds, david.reynolds2@usda.gov.

Special Requirements & Evaluation

  • Personnel: All hands-on technicians must be factory-authorized. Contractor employees must be U.S. citizens and undergo a Tier 2 background investigation. Strict site access and security protocols apply, including prohibition of personal devices for photography/videography.
  • Submission: Proposals must include pricing for all CLINs (rounded to the nearest dollar), resumes for key personnel, and two case studies. The revised Bid Schedule (Attachment 1) and Performance Work Statement (Attachment 2, v3) should be referenced. Offerors must acknowledge receipt of all amendments.
  • Evaluation: Award will be based on the greatest overall benefit, considering technically acceptable offers, option prices, and past performance as a significant factor.

People

Points of Contact

David ReynoldsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: May 12, 2026
Version 5
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View