UPS System Maintenance

SOL #: 1232SA26Q0411Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Manhattan, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 22, 2026, 11:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), Agricultural Research Service (ARS), is soliciting proposals for Uninterruptible Power Supply (UPS) System Maintenance at the National Bio and Agro-Defense Facility (NBAF) in Manhattan, KS. This is a 100% Small Business Set-Aside for a firm-fixed price requirements contract. The latest bid due date is May 22, 2026, at 11:30 AM ET.

Scope of Work

The contractor will provide comprehensive preventative maintenance and repair services for Rectifier/Charger, Battery, and UPS Systems. This includes:

  • Semi-annual and annual preventative maintenance, inspections, cleaning, calibration, and software/firmware updates.
  • Quarterly, semi-annual, and annual battery services, including voltage/current measurements and load testing.
  • Emergency repair responses (phone within 2 hours, on-site within 6 hours) and non-emergency repairs (timeline within 3 calendar days).
  • Optional replacement services for UPS batteries, battery strings, capacitor/capacitor banks, power modules, or full boards.
  • Contractor is responsible for labor to install government-furnished parts.

Contract Details & Period of Performance

  • Contract Type: Firm-Fixed Price Requirements Contract
  • Period of Performance: One (1) base year and four (4) one-year option periods, totaling five (5) years.
  • Place of Performance: National Bio and Agro-Defense Facility (NBAF), Manhattan, KS.
  • Set-Aside: 100% Small Business Set-Aside (NAICS 238210, Size Standard $19 Million).

Key Requirements & Special Conditions

  • Personnel: All contractor personnel must be US citizens, require a Tier 2 background investigation, and be factory-authorized technicians for the equipment serviced.
  • Security: Strict adherence to NBAF security protocols, including site access procedures and prohibition of personal devices for photography/videography.
  • Site Visit: A mandatory site visit was held on Tuesday, May 6, at 9:00 AM Central (US). Registration was required by April 28.
  • Cost Proposals: Must be submitted in whole dollars only; proposals with cents will be rejected. Resumes for key personnel and two case studies are also required.
  • Wage Determination: Applicable U.S. Department of Labor Wage Determination for Kansas (Pottawatomie and Riley counties) must be followed.

Submission & Evaluation

  • Evaluation Criteria: Award will be based on the greatest overall benefit, considering technically acceptable offers and option prices. Past performance will be a significant factor.
  • Submission: Offers must acknowledge all amendments.

Important Dates & Contact

People

Points of Contact

David ReynoldsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Combined Synopsis/Solicitation
Posted: May 19, 2026
Version 6
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View