USNS PUERTO RICO ROH

SOL #: N6264926RL012Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2026
2
Last Updated
Jun 11, 2026
3
Submission Deadline
Jun 22, 2026, 6:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy (NAVSUP FLT LOG CTR YOKOSUKA) is soliciting proposals for the Regular Overhaul (ROH) of the USNS PUERTO RICO (T-EPF 11). This comprehensive repair and maintenance effort will be performed in Thailand or South Korea. There is no set-aside designation for this opportunity. Proposals are due by June 22, 2026, at 2:00 PM Singapore time.

Scope of Work

The ROH includes a detailed repair and maintenance package as specified in Military Sealift Command (MSC) specification SSU SN 26-020. The work encompasses Category A items, with potential for Category B items via Option Line Item 0002, and accommodates growth work through Time-and-Materials (T&M) CLINs. The Work Item Index Report details tasks across various systems, including general services, hull, propulsion, electrical, communication, navigation, auxiliary machinery, habitability, HVAC, drydocking, and underway replenishment equipment.

Recent amendments have provided significant clarifications:

  • Aviation Facility Support: Specific part numbers for flood light assemblies and power cables have been provided.
  • Waterjet Maintenance: The scope for 2.5-year maintenance is clarified, differentiating between shipyard work (WI 929A) and OEM support (WI 992A).
  • Sea Valves: The required quantity for inspecting sea valves and sea chests has been updated from 10 to 30 valves (25x 2.5" and 5x 3"), with specific model and manufacturer details.

Contract & Timeline

  • Type: Solicitation (primarily Firm Fixed Price with T&M CLINs for growth work)
  • Period of Performance: September 14, 2026 – December 12, 2026 (with options extending to December 27, 2026)
  • Place of Performance: Thailand or South Korea
  • Set-Aside: None specified
  • Proposal Due: June 22, 2026, 2:00 PM Singapore time
  • Published: June 2, 2026 (latest amendment)

Submission & Evaluation

Proposals must be submitted electronically via email or DoD SAFE for large files. Evaluation will be based on Lowest Total Price and non-price factors, including Technical capability (understanding the Work Item Package, ability to perform, management control, and quality assurance) and Past Performance (recent and relevant efforts).

Additional Notes

Amendment 0002 added Section G.4, detailing requirements for Electronic Transfer of Funds Payments via the Federal Reserve Wire Transfer System for foreign firms. Awarded foreign firms must provide bank account details to the Contracting Officer within 5 days of contract award. Bidders should contact Kesavan KS (kesavan.krishnansingh.ln@us.navy.mil) for solicitation attachments, including specifications and references, which will be sent via DoDSafe email.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 6
Solicitation
Posted: Jun 11, 2026
View
Version 5
Solicitation
Posted: Jun 8, 2026
View
Version 4Viewing
Solicitation
Posted: Jun 2, 2026
Version 3
Solicitation
Posted: May 27, 2026
View
Version 2
Solicitation
Posted: May 19, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 27, 2026
View