USNS PUERTO RICO ROH

SOL #: N6264926RL012Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2026
2
Last Updated
Jun 11, 2026
3
Submission Deadline
Jun 22, 2026, 6:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, through NAVSUP FLT LOG CTR YOKOSUKA, is soliciting proposals for the Regular Overhaul (ROH) of the USNS PUERTO RICO (T-EPF 11). This critical maintenance work will be performed in Thailand or South Korea. Proposals are due by June 22, 2026, at 2:00 PM Singapore time.

Scope of Work

This solicitation covers a comprehensive repair and maintenance package as specified in SSU SN 26-020. The scope includes Category A items, with potential for Category B items via Option Line Item 0002, and accommodates growth work through Time-and-Materials (T&M) CLINs (0006/0007).

Recent amendments have clarified several key aspects:

  • The Deck Crane Hydraulic Winch Tear Down Inspection (Item 7.4.2 b) is not required, aligning with OEM recommendations, though lube oil sampling (7.4.2 a) remains.
  • All paint materials are confirmed as Contractor Furnished Material (CFM), and the shipyard is required to provide specific paint representatives (International Interspeed 5640 Coating and Sherwin-Williams SeaVoyage Coating) as needed.
  • The requirement for sea valves has been clarified to 30 valves (not 10), with specific models and materials detailed for 25x 2.5" and 5x 3" valves.
  • Waterjet maintenance scope is differentiated between shipyard work (WI 929A) and OEM support (WI 992A).
  • Specifications for Aviation Facility Support flood light assemblies and power cables have been provided.

Contract & Timeline

  • Type: Primarily Firm Fixed Price (FFP) with Time and Materials (T&M) CLINs for growth work.
  • Period of Performance: September 14, 2026, to December 12, 2026, with options extending to December 27, 2026.
  • Place of Performance: Thailand or South Korea.
  • Set-Aside: None specified.
  • Proposal Due: June 22, 2026, 2:00 PM Singapore time.
  • Published: June 8, 2026 (latest amendment).

Submission & Evaluation

Proposals must be submitted electronically via email or DoD SAFE for large files. Evaluation will consider the Lowest Total Price alongside non-price factors, including Technical capability (understanding the Work Item Package, ability to perform, management control, and quality assurance) and Past Performance (recent and relevant efforts).

Additional Notes

Offerors must contact kesavan.krishnansingh.ln@us.navy.mil to receive solicitation attachments, including specifications and references, which will be sent separately via DoDSafe email. Foreign firms awarded a contract will need to provide Electronic Funds Transfer (EFT) payment information within 5 days of award, adhering to specific requirements for the Federal Reserve Wire Transfer System. The government will provide requested reference files to facilitate accurate quotations.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Jun 11, 2026
View
Version 5Viewing
Solicitation
Posted: Jun 8, 2026
Version 4
Solicitation
Posted: Jun 2, 2026
View
Version 3
Solicitation
Posted: May 27, 2026
View
Version 2
Solicitation
Posted: May 19, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 27, 2026
View