Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for the installation of a Government-Provided 500kW Kohler Diesel Generator (Model 500REOZJC) at the Jones Hole National Fish Hatchery (NFH) in Vernal, Utah. This is a Total Small Business Set-Aside with an estimated value between $25,000 and $100,000. Proposals are due Thursday, February 5, 2026, by 5 p.m. EST.
Scope of Work
The project involves the comprehensive installation of a new standby/emergency power source. Key tasks include:
- Site Preparation: Modifying a concrete pad (a 6'x8'x1' section), providing underground conduit for power, controls, and grounding, and setting the 14,000-pound generator (already on-site) in place using a crane.
- Electrical Installation: Installing and terminating AC power cables, connecting to the existing grounding system, installing generator control wiring, and integrating the APM603 control system with the facility's emergency power transfer switch. This may include installing an 800 Amp Disconnect and requires circuit protection (e.g., a 500 amp, 3 pole reducing breaker) due to the generator's amperage. An alarm autodialer and remote monitoring system must also be installed.
- Testing & Commissioning: Completing factory startup, load testing (coordinated with Moon Lake Power Company), and testing alarms/safeties.
- Training & Documentation: Providing an on-site overview of the new installation.
- Special Requirements: A certified Kohler installer is required to maintain the warranty. FWS is responsible for fueling the generator prior to startup.
Contract & Timeline
- Type: Firm-Fixed-Price construction contract.
- Estimated Magnitude: Between $25,000 and $100,000.
- Set-Aside: Total Small Business (NAICS 238210, $19M size standard).
- Period of Performance: 30 calendar days from the Notice to Proceed.
- Proposal Due: Thursday, February 5, 2026, 5 p.m. EST.
- Published: Latest amendment posted February 2, 2026.
Evaluation
Award will be made on a Best Value basis, considering Price, Technical Proposal (work plan and key personnel), and Past Experience.
Key Clarifications & Requirements
- Davis-Bacon Act: Prevailing wage rates (General Decision UT20260077) apply for Uintah County, Utah.
- Bid Schedule: Bidders must complete the provided "Prices (Bid Schedule)" (Section B) with a lump sum price for the electrical work.
- Bonds: Performance and Payment Bonds are required if the award exceeds $35,000 (Payment Bond) or $150,000 (Payment and Performance Bonds).
- Site Visit: Highly encouraged; instructions are in Section L of the solicitation.
- Submission: Electronic submission via email to nicole_c_johnson@fws.gov.