Veterans Point Trail Rehabilitation Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting proposals for the Veterans Point Trail Rehabilitation Project in the Black Hills National Forest, Pennington County, South Dakota. This project involves significant trail repair, reconstruction of retaining walls, and other infrastructure improvements. This is a Total Small Business Set-Aside. Quotes are due by March 24, 2026, at 10:00 a.m. Mountain Time.
Scope of Work
The project focuses on rehabilitating the approximately 2,959-foot asphalt Veterans Point Trail, which provides access to fishing piers and viewpoints at Pactola Reservoir. Key tasks include:
- Filling and sealing cracks, reconstructing select sections, stabilizing eroding areas, and applying a seal coat to the asphalt trail.
- Removing existing timber retaining walls and reconstructing them with segmental concrete block retaining walls.
- Repairing damaged pipe railing and eliminating unnecessary sections.
- Constructing gabion (wire rock baskets) reinforcement for eroded sections at the trail's edge and bridge abutments.
- Eliminating an overlook near the water's edge. An optional bid item includes work on a 1,014-foot "Lakeshore Loop," encompassing crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The project site is located on Highway 385, just North of Pactola Reservoir.
Contract Details
- Contract Type: Anticipated Firm Fixed Price Contract.
- Magnitude of Construction: Between $250,000 and $500,000.
- Estimated Period of Performance: March 1, 2026, through May 20, 2027.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 237310 - Highway, Street, and Bridge Construction, with a $45M size standard.
- Place of Performance: Custer, SD.
Submission & Evaluation
Offerors must submit a Technical Approach, Past Performance, Pricing Documentation (using Attachment 3), and a Bid Guarantee (20% of total quote). Quotes are limited to a maximum of 10 pages. The award will be based on a comparative evaluation, selecting the offeror representing the best value to the Government, considering Technical Approach and Understanding of the Project, Past Performance, and Price. Contractors must be registered on www.Sam.gov at the time of quote submission. Performance & Payment Bonds (100% of original contract award price) will be required within 10 days after award.
Key Dates & Contacts
- Additional Site Visit: February 25, 2026, at 1:00 p.m. Mountain Time. RSVP to Richard Zacher (Richard.zacher@usda.gov or (605)440-3471) by noon on February 24, 2026.
- Questions Due: March 3, 2026, at 10:00 a.m. Mountain Time.
- Quotes Due: March 24, 2026, at 10:00 a.m. Mountain Time.
- Submission: Email questions and quotes to Janice King (janice.king@usda.gov) and Lucas Dahlman (lucas.dahlman@usda.gov). The subject line must be "Veterans Point Trail Rehabilitation Question/Quote – 1240LT26Q0015".
- Primary Contact: Janice King (janice.king@usda.gov).
- Secondary Contact: Lucas Dahlman (lucas.dahlman@usda.gov).
Amendments
This solicitation has been amended multiple times. Amendment 0003 (posted Feb 18, 2026) extended the due dates for questions and quotes, and scheduled an additional site visit. Amendment 0001 (posted Feb 10, 2026) updated the Wage Determination.