VOYAGE REPAIRS (VR)

SOL #: N6817126QN006Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLC SIGONELLA NAPLES OFFICE
FPO, AE, 09622-0050, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 17, 2025
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Mar 16, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, through NAVSUP FLC SIGONELLA NAPLES OFFICE, is soliciting proposals for Voyage Repair (VR) services for the USNS SHIP (T-AKE). This solicitation, identified as N6817126QN006, has undergone multiple amendments, with the latest changing the place of performance to Taranto, Italy, and extending the quote due date to March 16, 2026.

Scope of Work

This Firm Fixed-Price (FFP) solicitation requires comprehensive voyage repair services. Key work items, detailed in the J-2 Work Specifications Package, include:

  • Hull and Structural: Exterior Weather Deck Handrail Replacement, UNREP Stations 3 thru 6 Kingposts Preservation, MMR Deck Grating Diamond Plate Install, Reverse Osmosis Platform Modification, and modifications to existing waste drain piping systems (e.g., cold cutting, flange installation).
  • Mechanical/Electrical: Gypsy Winch Master Control Pedestal Foundation Plate, Kick Pipe & Stuffing Tube, Winch control station plate replacement (stainless steel, 9"x13.5"), and detailed wiring/connection schematics for GYPSY WINCH 2 MASTER CONTROL.
  • General Services: Gas Free Certificates, MMR Bilge Preservation, Various Equipment Deck Covering PRC Epoxy Install, and Exterior Light Brackets. The period of performance is scheduled from April 22, 2026, to May 6, 2026.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Not a small business set-aside.
  • Place of Performance: Taranto, Italy (updated by Amendment 0008)
  • Period of Performance: April 22, 2026 - May 6, 2026 (updated by Amendment 0008)
  • Quote Due Date: Monday, March 16, 2026, at 14:00 Central European Time (CET) (updated by Amendment 0008)
  • Published Date: March 6, 2026 (latest amendment)

Evaluation

Award will be made to the Lowest Priced Technically Acceptable (LPTA) offeror. Evaluation will focus on Technical Capability (rated Acceptable or Unacceptable) and Price. Only technically acceptable proposals will be considered for price evaluation.

Additional Notes

This solicitation has been significantly amended multiple times. Offerors must acknowledge receipt of Amendment 0008, which re-opens the RFQ and updates critical details. Required documentation includes Standard Form 18, completed Representations and Certifications (Section K), Contractor Pricing Breakdown (J-1), and the Work Specification Package (J-2). Bidders must be registered in SAM.gov, and invoicing will be processed through WAWF. Technical references and photos are available upon request. Contact: Antonella De Fraia Frangipane at Antonella.defraiafrangipane.ln@us.navy.mil or +39 081 568 3560.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Mar 13, 2026
View
Version 9
Solicitation
Posted: Mar 13, 2026
View
Version 8Viewing
Solicitation
Posted: Mar 6, 2026
Version 7
Solicitation
Posted: Mar 6, 2026
View
Version 6
Solicitation
Posted: Feb 17, 2026
View
Version 5
Solicitation
Posted: Feb 13, 2026
View
Version 4
Solicitation
Posted: Jan 30, 2026
View
Version 3
Solicitation
Posted: Jan 2, 2026
View
Version 2
Solicitation
Posted: Dec 29, 2025
View
Version 1
Solicitation
Posted: Dec 17, 2025
View