VOYAGE REPAIRS (VR)

SOL #: N6817126QN006Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLC SIGONELLA NAPLES OFFICE
FPO, AE, 09622-0050, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 17, 2025
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Mar 16, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, through NAVSUP FLC SIGONELLA NAPLES OFFICE, is soliciting proposals for Voyage Repair (VR) services for the USNS SHIP (T-AKE). This Firm Fixed-Price (FFP) solicitation requires contractors to perform various repair and preservation tasks. The Place of Performance is Taranto, Italy, with work scheduled from April 22, 2026, to May 6, 2026. Proposals are due Monday, March 16, 2026, at 14:00 Central European Time (CET).

Scope of Work

This opportunity covers a range of Category "A" work items as detailed in the J-2 Work Specification Package. Key tasks include:

  • Exterior Repairs: Handrail replacement, UNREP Stations 3 thru 6 Kingposts preservation (requiring scaffolding and pressure washing), exterior light brackets, and exterior weather deck pipe bracket replacement.
  • Internal Systems: Kick pipe & stuffing tube work, MMR deck grating diamond plate installation (1/4" plate acceptable), reverse osmosis platform modification, MMR bilge preservation (no tank cleaning), and various equipment deck covering PRC epoxy installation.
  • Specialized Equipment: Gypsy Winch Master Control Pedestal Foundation Plate work (including wiring details), replacement of a failed plate on the Gypsy Winch No. 3 controller stand (stainless steel, 9" x 13.5"), and detailed wiring/connection schematics for Gypsy Winch 2 Master Control (Part Number L667-EP015).
  • Piping Modifications: Cold cutting and installation of 2" 150# carbon steel socket welded flanges for waste drain piping systems in various compartments.
  • General Requirements: Category "N" work items cover general requirements, technical representation, testing, and safety procedures.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Not a small business set-aside.
  • Place of Performance: Taranto, Italy
  • Period of Performance: April 22, 2026 - May 6, 2026
  • Proposal Due Date: Monday, March 16, 2026, at 14:00 CET
  • Submission Method: Electronically via email.

Evaluation & Submission

Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) methodology. Technical Capability will be rated as Acceptable or Unacceptable; only technically acceptable proposals will be considered for price evaluation. Required documentation includes Standard Form 18, completed Representations and Certifications (Section K), the Contractor Pricing Breakdown (J-1), and the Work Specification Package (J-2). Bidders must be registered in SAM.gov.

Contact Information

For inquiries, contact Antonella De Fraia Frangipane at Antonella.defraiafrangipane.ln@us.navy.mil or +39 081 568 3560.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Mar 13, 2026
View
Version 9Viewing
Solicitation
Posted: Mar 13, 2026
Version 8
Solicitation
Posted: Mar 6, 2026
View
Version 7
Solicitation
Posted: Mar 6, 2026
View
Version 6
Solicitation
Posted: Feb 17, 2026
View
Version 5
Solicitation
Posted: Feb 13, 2026
View
Version 4
Solicitation
Posted: Jan 30, 2026
View
Version 3
Solicitation
Posted: Jan 2, 2026
View
Version 2
Solicitation
Posted: Dec 29, 2025
View
Version 1
Solicitation
Posted: Dec 17, 2025
View