WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107

SOL #: 69056726B000006Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Forks, WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 9, 2025
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Apr 1, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for Olympic National Park ERFO Repairs 2022 Road 107 (Project No. WA ERFO NPS OLYM 2022-1 (3)). This Total Small Business Set-Aside opportunity involves critical bank stabilization and roadway repairs along Road 107 in Jefferson County, Washington. The project aims to address erosion and protect the roadway, with an estimated value between $700,000 and $2,000,000. Bids are due April 1, 2026, by 4:00 p.m. local time.

Scope of Work

This firm-fixed-price contract focuses on comprehensive repairs at Mile Post (MP) 0.3-0.5 and MP 0.8 of Road 107 within Olympic National Park. Key tasks include:

  • Earthwork: Placement of approximately 606 cubic yards of fill at MP 0.3 and 1,037 cubic yards at MP 0.8, with 590 cubic yards retained for embankment protection and juvenile salmonid habitat.
  • Streambank Stabilization: Installation of riprap (Class 4 and 5), root wads, conserved streambed material, boulders, engineered log jams (ELJs) with dolosse, coarse woody debris, and vegetation. Hydraulic designs specify revetments, root wads with boulders, and multi-layered ELJ units.
  • Environmental Mitigation: Includes turf establishment, planting of government-furnished species (Sitka Spruce, Willow, Cottonwood, Red Alder, Western Red Cedar), and temporary stream diversions.
  • General Construction: Construction survey and staking, contractor quality control, sampling and testing, erosion and sediment control, excavation, embankment, and incidental construction (rental equipment, labor, plants, temporary traffic control).
  • Specifications: All work must conform to the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24" and utilize U.S. Customary units.

Contract Details

  • Type: Firm-Fixed-Price Contract (Invitation for Bids - IFB)
  • Set-Aside: Total Small Business Set-Aside (FAR Clause 52.219-6)
  • Estimated Value: $700,000 to $2,000,000
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (assumed by May 22, 2026), with completion not later than August 19, 2026.

Submission & Evaluation

  • Bid Submission: Printed copies of bids must be submitted to the address listed on the enclosed SF 1442. Electronic bids will not be accepted.
  • Deadline: April 1, 2026, by 4:00 p.m. local time.
  • Evaluation: Award will be based on price and other price-related factors.
  • Requirements: Bids received without a valid bid bond will be rejected. Proposals must be in English and U.S. dollars.

Additional Notes

Prospective bidders are encouraged to view the project site. Technical questions should be submitted via email to wfl.plans-spec@dot.gov. General inquiries can be directed to wfl.contracts@dot.gov or by phone at 360-619-7520. Electronic plan sheets are available on SAM.gov. Pre-bid information and technical questions are accepted until 5 business days before the bid due date.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download

Versions

Version 3
Solicitation
Posted: Feb 18, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 17, 2026
Version 1
Pre-Solicitation
Posted: Dec 9, 2025
View